网站大量收购独家精品文档,联系QQ:2885784924

中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure).doc

中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure)

中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure) China Management Information Network -- knowledge base -- how to build an effective WBS structure? Your present position: China management information network, case library, project management, full text How do you build an effective WBS structure? Author: Zhang Peng from: project management exploration update: 2006-3-2 popularity: 259 In the process of project management, project planning and control is a very important link, good project planning can At the same time, the project schedule, quality and investment are well controlled, and the failure of project planning is possible Confusion, loss of control, or even eventual failure of the project. In the process of project planning, people often turn to the WBS method to decompose the content of the project. stay On this basis, the allocation of resources, schedule, and estimate the cost of the project. WBS as the project size The difference is not the same. A small project requires only a simple WBS structure and a partitioning base of the structure It is clear at first and the results are easily recognized. The bigger the project, the more important the WBS is, From another angle, the harder it is to do well. For large projects, the WBS structure of a project is often determined Can be done overnight, need to be repeated feedback, correction, and finally can be accepted by all parties to a project WBS structure. There are many ways to divide the WBS structure of a project, such as division by profession, division by subsystem and sub engineering, Each method has its advantages and disadvantages according to different stages of the project. In general, determine The WBS structure of the project needs to be combined with several methods, using different methods at different levels of WBS. Then, what are the methods and principles that need to be followed to determine the WBS structure of a

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档