网站大量收购独家精品文档,联系QQ:2885784924

中山嘉明电力有限公司(Nakayama Kaya Power Ltd).doc

中山嘉明电力有限公司(Nakayama Kaya Power Ltd).doc

  1. 1、本文档共2页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中山嘉明电力有限公司(Nakayama Kaya Power Ltd)

中山嘉明电力有限公司(Nakayama Kaya Power Ltd) Nakayama Kaya Power Co., Ltd. 3 * 390MW gas steam combined cycle Environmental impact report of cold and heat and power cogeneration project (Abridged Edition) I. General Situation of the project 1. Origin of the project Zhongshan Hengmen power plant is located in the Pearl River Estuary Torch Development Zone, saddle Island, the power plant unit 2, a period of 1 (2 x 125MW) put into operation in 1997, completed in 2007 two oil gas; 3, unit 4 (2 * 350MW) have been completed and put into production in 2009. The existing units of the power plant are all generating units without heating capacity. Zhongshan Torch Development Zone is a state-level high-tech zone established by the former Ministry of science and technology, the Guangdong provincial government and the Zhongshan municipal government in 1990. According to the State Science and Technology Commission approved the Zhongshan torch high tech Industrial Development Zone Area: the total effective area of 15.1 km2, of which the policy area of 9.8 km2, concentrated new zone 5.3 km2. The heat load of many Torch Development Zone, the heat load of the rapid growth of residential, commercial office cooling load demand, according to the Zhongshan torch hi tech Industrial Development Zone, Nanlang area cogeneration plan, Nakayama Kaya power company intends to cross under the door in the construction of 3 units of power plant for 9F gas CCHP unit of Zhongshan torch hi tech Industrial Development Zone -- Nanlang area for cogeneration, cogeneration, meet the heating and cooling demand concentrated Nanlang area. In response to the requirements of the planning, the future focus on the development of enterprises, Nakayama Kaya power company intends to invest in the construction of the Nakayama Kaya power company 3 * 390MW gas steam combined cycle cogeneration projects, the expansion project is planned to build 3 sets of 9F turbine cogeneration projects, the implementation of CCHP, provide stea

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档