假山建造2(Rockery construction 2).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
假山建造2(Rockery construction 2)

假山建造2(Rockery construction 2) 1.1 rockery construction (1) positioning and laying of rockery; 1, review drawings First of all to understand the intention of rockery engineering design work, structure form and foundation of the master mountain, in order to correct lofting. Secondly, in order to facilitate the layout, according to a certain proportion in the plan, according to the project size or complexity of the layout, draw the grid size of 2m * 2m or 5m * 5m or 10m * 10m, with its square foot and intersection contour as the ground for lofting. 2, indeed lofting In the design grid online, choose a reliable ground and fixed point of reference, as the lofting point, then this point, according to the actual size of draw grid on the ground; and to be checked and the drawing of contour line position, released on the ground the corresponding gray contour. In order to facilitate the construction of foundation and earth, should not affect the pile and construction scope, select relevant parts easy to check the size of foundation, such as both vertical and horizontal center line, the rockery transverse direction and boundary line, the main parts of the control line position, set up in Longmen or buried pile stakes for lofting the white line to dig or when construction is being dug up, as a measure of the size or layout of the basis points again. (two) basic construction; The construction of the foundation should be carried out according to the requirements of the setting. The rockery foundation has shallow foundation, deep foundation and pile foundation. 1, shallow foundation construction The shallow foundation construction procedure is: the original soil ramming, the laying cushion, the masonry foundation. Shallow foundation is usually the foundation laid on the ground by tamping. This thing should be based will choose the ground leveling, remove the high ridge, fill the pits, and then compacted, spreading cushion and foundation. The quality of the infrastructure is strict

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档