网站大量收购独家精品文档,联系QQ:2885784924

坎儿井(Karez).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
坎儿井(Karez)

坎儿井(Karez) Karez Fellow friends: Good morning. Believe that yesterdays experience has let everyone to experience known as Fire Island in Turpan, much of it. Turpan is a world famous Huozhou, mean annual precipitation, its only about 16 mm, while the average annual evaporation is as high as 3000 mm. It is the driest place in china. But in the driest part of the country, there are about 500000 people. In particular the construction of a grape in the flame mountain of the world known to the world, thanks to the life of Karez oasis. I will take you to visit this world famous underground water - karez. A total of more than 1600 Xinjiang Karez, mainly distributed in the Turpan basin, Hami basin, southern Kuche and Northern Qitai, Pishan, Mulei, bukang etc.. In the area of Turpan is more than 1200, the total length of 5000 kilometers, which is equivalent to the length of the famous the Great Wall, known as the underground the Great Wall, and the Great Wall, Beijing Hangzhou the Grande Canale and known as the three ancient Chinese engineering. Karez is known as the underground the Great Wall, as the name implies, Karez is a huge underground engineering. Since everyone on the Karez construction method so curious, Ill introduce you in detail. Karez consists of shafts, beam and channel and flood ridge of four parts. In the mountain snow slush site, choose a suitable site excavation. On the ground, every few meters or tens of meters dug a shaft dug, connecting shaft from the bottom to the side, on the formation of the culvert. The role is to dig out from the culvert in sand take to the surface, and the ventilation and lighting effects, in order to prevent the human or animal after accidentally fall into the ground, to prevent sand blown away by the wind into the blocked culverts, wellhead each shaft are covered, so that not only can prevent groundwater evaporate, also can keep the water from pollution. The culvert is the function of the underground water in the water into it. C

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档