网站大量收购独家精品文档,联系QQ:2885784924

城市规划相关知识精讲班第20讲讲义(Urban planning related knowledge, lectures, lectures, lectures, Twentieth).doc

城市规划相关知识精讲班第20讲讲义(Urban planning related knowledge, lectures, lectures, lectures, Twentieth).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
城市规划相关知识精讲班第20讲讲义(Urban planning related knowledge, lectures, lectures, lectures, Twentieth)

城市规划相关知识精讲班第20讲讲义(Urban planning related knowledge, lectures, lectures, lectures, Twentieth) Urban planning related knowledge, intensive lectures, Twentieth lectures, courseware, handouts (Global vocational education online) Urban planning related knowledge, lectures, lectures, lectures, Twentieth Familiar with the principle of common pipe laying (three) familiar with the principle of common pipe laying; (1) the heat pipe shall not be combined with electric power, communication cables and pressure pipes; (2) the drainage pipe shall be arranged at the bottom of the ditch. When there is a corrosive medium pipe in the trench, the drain pipe shall be located above it; (3) the elevation of the corrosive medium pipeline shall be lower than other pipelines in the trench; (4) fire hazards belong to a, B, C, liquid, liquefied petroleum gas, flammable gas, toxic gas and liquid, and corrosive medium, and shall not be laid in common ditch; (5) pipelines that may affect each other shall not be laid in common ditch. (four) familiar with related technical terms (1) comprehensive terminology 1. horizontal horizontal distance: the horizontal distance between the adjacent two pipelines laid in parallel direction. 2. line vertical clearance: the vertical distance between the top of the outer wall of the pipeline and the lowest point of the outer wall of the pipeline when the two pipelines are crossed. 3. pipeline laying depth: refers to the ground to the bottom of the pipe (wall) distance, that is, the ground elevation minus the pipe elevation. 4. pipeline soil depth: refers to the ground to the top of the pipe (outer wall) distance. 5. line of the same type: the same profession, and the same use of functional engineering pipeline. 6., different types of pipelines: refers to the use of different functions of the engineering pipeline. 7., special canal: refers to the laying of the same category of engineering pipelines dedicated ditch. 8., integrated pipe ditch: refers to different typ

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档