孔桩垂直度检查方法(Method for checking verticality of Bored Piles).doc

孔桩垂直度检查方法(Method for checking verticality of Bored Piles).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
孔桩垂直度检查方法(Method for checking verticality of Bored Piles)

孔桩垂直度检查方法(Method for checking verticality of Bored Piles) Inspection method for verticality of bored piles -- Method for checking verticality of Bored Piles Anonymous questions 2009-05-05 20:00:29 release .2 engineering academic answer.30009 2009-05-05 21:09:19 | 0 people think the answer is good | 0 people think the answer did not help . The construction of bored pile is different from that of retaining wall, such as mud wall protection method and full pipe construction method, two kinds. 1) mud protection wall construction method Impact drilling, punching and drilling, rotary drilling, drilling and so on, mud wall construction method can be used. The construction method is: land leveling, slurry preparation, buried steel tube, laying work platform, installation and positioning, drilling drilling, hole cleaning and inspection hole quality, reinforcing cage, decentralization of pouring underwater concrete to pull out the cylinder, check the quality of nursing. Construction sequence (as shown) (1) construction preparation Construction preparation includes selection of drilling rigs, drilling tools, site layout, etc.. The drilling rig is the main equipment for the construction of bored piles. It can be chosen according to the geological conditions and the application conditions of various drilling machines. (2) installation and location of drilling machine; If the foundation of the drilling machine is installed, if it is not stable, the slope of the boring machine, the inclination of the pile and the eccentricity of the pile are easy to be affected, so the foundation should be installed firmly. The slope of the foundation of the formation is relatively soft, can be bulldozed, reinforcement plate in the pad or sleeper. In order to prevent the pile position allowed construction is very important to the set the center position and the correct installation of drilling machine, the rig drilling machine, the first use of the power drill and near the cage with the drill pipe

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档