- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑安全(Building safety)
建筑安全(Building safety)
Building safety.Txt
Establishment of safety technical measures in construction plan
The construction plan (or design) is the guiding principle for the specific action of the construction, and its safety technical measures are an important part of the construction plan. As emphasized in the engineering construction must be made before the safety technical measures, the provisions of the Ministry of Construction issued in early 1983 state-owned enterprise work safety regulations: all of the construction project construction organization design (or construction plan) must have the safety technical measures. Construction law thirty-eighth provisions are more specific: construction enterprises in the preparation of construction organization design, should be based on the characteristics of construction projects to develop corresponding safety technical measures.. Because each project from start to completion of the whole process, there are many unsafe factors and hidden danger, if unforeseen, poor safety management measures, will affect the construction progress and benefits, and even cause personal accidents. In order to ensure the safety in the construction process, we must through pre analysis, so as to better control, eliminate the hidden dangers in the construction process, eliminate hazards, and ensure the smooth progress of construction. 1. requirements for construction program staff
The personnel construction plan is the construction process of the designer, must establish a safety first, from the beginning of construction drawings must seriously consider security issues, not for construction and operation personnel to stay hidden as much as possible. Staff should fully grasp the general situation of the project, construction period, site environmental conditions, according to the structure features of the project, the scientific selection of construction methods, construction machinery, power distribution facilities and temporary power line
您可能关注的文档
- 婚礼可以使用的音乐(Music for weddings).doc
- 婴儿取名--小孩起名常用字(二)(Baby name -- child name commonly used word (two)).doc
- 婴儿打预防针时间表(Baby jab schedule).doc
- 婴儿早教(Infant education).doc
- 婴儿取名--小孩起名的方法(Baby naming -- the method of naming children).doc
- 子宫肌瘤介入栓塞治疗规范化操作指南(Guidelines for standardization of interventional embolization therapy for uterine fibroids).doc
- 孔子思想的推广导致人的大脑中的科学思维能力全面被破坏(The popularization of Confucius thought leads to the complete destruction of scientific thinking ability in the brain).doc
- 子网掩码计算问题(Subnet mask calculation problem).doc
- 婴儿晒太阳的时间根据季节,如冬季一般在中午11-12点左右,晒太阳时间长短应由少到多(The time for the baby to bask in the sun according to the season, such as winter, usually around 11-12 in the afternoon, the sun should be less than the length of time).doc
- 孔子时教(Confucius teaches).doc
文档评论(0)