- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑工程施工测量方案2(Construction engineering survey plan 2)
建筑工程施工测量方案2(Construction engineering survey plan 2)
The construction scheme of 2.txt measuring opportunities like the bald head hair, you catch caught, catch No. I talked to you for 10 minutes, but I didnt have any arguments with you. Then one of us must be very hypocritical! Fault is a brief regret, miss is always regret. Meet is the edge, know each other is a share, love is the agreement, together is true love. Construction engineering construction survey plan 2007-03-15 23:40 (excerpt from the prestressed, basement waterproofing membrane, construction works, construction surveying program in the measurement part, for reference. Natives note)
First, check the basis of the start, the establishment of building control network
1. check the starting basis
Party A shall provide positioning before measuring, control point coordinates three clothesbrush interconnected, and two elevation control points, as the field control based on point. Take the coordinate control point as the starting point. Two level traverse survey is used as building plane control network. On the basis of elevation control points, the level of leveling is measured and the elevation is measured to the field area.
The plane control network accuracy of wire not less than 1/10000, elevation control survey closure error no greater than 30 V L mm (L for connecting route length to km).
When building a building control network, the starting point should be checked. According to the coordinates of the buildings corner points on the red line pile and the drawings, the relative relation between them is calculated and the angle and distance calibration is carried out. Calibration error: the angle is + 12; the relative accuracy of the distance is not less than 1/15000.
The initial elevation point application annexed leveling check, elevation calibration closure error is no more than 10mm (n for root n station number).
2. building a building control network
Based on the traverse point, a rectangular plane contro
您可能关注的文档
- 婴儿取名--小孩起名的方法(Baby naming -- the method of naming children).doc
- 子宫肌瘤介入栓塞治疗规范化操作指南(Guidelines for standardization of interventional embolization therapy for uterine fibroids).doc
- 孔子思想的推广导致人的大脑中的科学思维能力全面被破坏(The popularization of Confucius thought leads to the complete destruction of scientific thinking ability in the brain).doc
- 子网掩码计算问题(Subnet mask calculation problem).doc
- 婴儿晒太阳的时间根据季节,如冬季一般在中午11-12点左右,晒太阳时间长短应由少到多(The time for the baby to bask in the sun according to the season, such as winter, usually around 11-12 in the afternoon, the sun should be less than the length of time).doc
- 孔子时教(Confucius teaches).doc
- 孔桩垂直度检查方法(Method for checking verticality of Bored Piles).doc
- 孔桩施工概论(Introduction of bored pile construction).doc
- 孕前准备正确适当的运动方式(Pre pregnancy preparation the right and proper way of moving).doc
- 孕前男女双方的准备(Preparation for both sexes before pregnancy).doc
文档评论(0)