建筑工程练习题6-(Construction exercises 6-)
建筑工程练习题6-(Construction exercises 6-)
6. Safety production means various measures and activities adopted in order to prevent accidents occurring in the process of production and ensure the safety of workers in production.
A, personal injury
B, property damage
C, device damage
D, work environment destruction
E, man-made destruction
7. The load on the rigid frame is as shown in the following four structural deformation diagrams.
A, A
B, B
C, C
D, D
8, the span of a cast-in-place reinforced concrete beam is 9m, and the span height of the arch can be.
A, 2mm
B, 5mm
C, 15mm
D, 20mm
E, 30mm
9, a comprehensive building construction area of 3600M2, is a 10 layer concave flat building, one or two floors for shops, more than three storeys for residential. One layer, two layer of 3.5m, more than three storey 3.0m, 31m high, the foundation for concrete pile foundation, the slurry retaining wall construction method in the hole process, part of pile hole collapse. The main structure of the cast-in-place reinforced concrete beam slab column frame structure, using C25 concrete infill wall of aerated concrete block, in the main structure of the construction process, the three layer of concrete test block strength is not up to the design requirements, but the actual strength of the test is still not up to the requirements after checking the design unit and to meet the structural safety performance.
Question:
(1) what are the possible causes of the collapse of the hole wall during the construction of the pile foundation and what are the prevention methods?
(2) whether the quality problems in the construction of main structure need to be dealt with? Why?
(3) what are the possible reasons for the low strength grade of the main concrete?
10, a company of new residential buildings, the construction unit is determined through public bidding, the contract price for the adjustable price contract, construction contract issued by the Ministry of construction in 1999, the construction contract m
您可能关注的文档
- 婴儿取名--小孩起名的方法(Baby naming -- the method of naming children).doc
- 子宫肌瘤介入栓塞治疗规范化操作指南(Guidelines for standardization of interventional embolization therapy for uterine fibroids).doc
- 孔子思想的推广导致人的大脑中的科学思维能力全面被破坏(The popularization of Confucius thought leads to the complete destruction of scientific thinking ability in the brain).doc
- 子网掩码计算问题(Subnet mask calculation problem).doc
- 婴儿晒太阳的时间根据季节,如冬季一般在中午11-12点左右,晒太阳时间长短应由少到多(The time for the baby to bask in the sun according to the season, such as winter, usually around 11-12 in the afternoon, the sun should be less than the length of time).doc
- 孔子时教(Confucius teaches).doc
- 孔桩垂直度检查方法(Method for checking verticality of Bored Piles).doc
- 孔桩施工概论(Introduction of bored pile construction).doc
- 孕前准备正确适当的运动方式(Pre pregnancy preparation the right and proper way of moving).doc
- 孕前男女双方的准备(Preparation for both sexes before pregnancy).doc
文档评论(0)