建筑工程质量通病防治办法(Construction project quality defects, prevention and control measures)
建筑工程质量通病防治办法(Construction project quality defects, prevention and control measures)
1 General Provisions
1.1, in order to improve the quality of the project, overcome the common defects in the quality of the project, and standardize the prevention and control of the common defects in the project (hereinafter referred to as the prevention and control of common diseases), these measures are formulated.
1.2 in the course of the design, construction and supervision of the project, in addition to the implementation of the relevant laws, regulations and engineering standards of the state, such measures shall also be implemented.
2 basic provisions
2.1 common problems prevention implementation organized by the construction unit, the parties participating in the construction quality of the main responsibility should fulfill the measures provisions in accordance with their respective responsibilities.
2.2, the prevention and control of the relevant costs incurred should be included in the project budget.
2.3, the project quality supervision institutions should be included in the supervision of the prevention of common problems.
2.4 the completion acceptance of the project shall be provided in addition to the existing laws, regulations and engineering standards, and the following relevant materials shall also be provided:
2.4.1 by the participation of all parties will sign the construction quality defects prevention task book (Appendix 1)
2.4.2 construction unit report on the prevention and control of construction quality defects (Appendix 2)
2.4.3 supervision unit construction project quality problems prevention and control work evaluation report (Schedule 3)
3 the main responsibility of the parties participating in the construction and management measures
3.1 construction units
3.1.1 before launching, issued a construction project quality problems prevention task book.
3.1.2 regularly hold regular meetings of the project to coordinate and solve the problems arising from the
您可能关注的文档
- 孕前准备正确适当的运动方式(Pre pregnancy preparation the right and proper way of moving).doc
- 孕前男女双方的准备(Preparation for both sexes before pregnancy).doc
- 孕期倒数100天的衣食住行禁忌(The last 100 days of pregnancy taboo basic necessities of life).doc
- 字符编码知识Unicode、UTF-8、ASCII、GB2312等编码之间是如何转换的(Character encoding knowledge how is the conversion between Unicode, UTF-8, ASCII, and GB2312 encoded).doc
- 字符和字符串(Characters and strings).doc
- 字符编码ASCII,Unicode和UTF-8详解(Character encoding, ASCII, Unicode, and UTF-8).doc
- 孔的工艺(Hole process).doc
- 孝惠皇后张嫣(Empress Zhang Yan, Xiao Hui queen).doc
- 婴儿取名字大全(Baby names).doc
- 孝感城区城市综合改造实施方案(试行)(Implementation plan of urban comprehensive transformation in Xiaogan city (for Trial Implementation)).doc
文档评论(0)