建筑工程容易漏项的(Construction projects are prone to leaks)
建筑工程容易漏项的(Construction projects are prone to leaks)
1 the steam holes in the roof insulation roof of flat roof
2 embedded iron pieces in the stair railing
3 scaffold for paint and coating construction
4 precast slab beam concrete: plate, beam head concrete, transportation, installation
5 bored pile: drilled into the depth of rock (the municipal and highway quota projects contain a great gap in content)
6, the installation of indoor plumbing is easy to miss
7 extra high cost of outdoor pipe installation
8 angle steel fabrication and installation and material costs
9 the coefficient of unilateral soil waste in trench earthwork is easy to miss
10, the artificial coefficient of outbound soil forget to multiply
11 the list of cables and wires is only supplied with a net amount of work. In addition, the allowance, bending, loss and so on should be added to the group price
12 the base steel is easy to leak in the distribution cabinet installation list
13 water supply and drainage on the pipe installation list, the casing is easy to leak
Plugging of 14 air duct through wall
15 control valve test pressure irrigation temporary short tube production and installation.
16, equipment installation, lifting equipment, elimination.
17. The bolts installed on the flanges in the process piping are non valuation materials.
18, installation part: high-rise building additional cost calculation of the base, including 6 or less than 20m of all labor costs. When the high-rise building is in accordance with the ultra high construction condition, the additional cost and the extra high increase fee of the high-rise building are calculated together.
19, roof line, cover plate! Mainly scattered parts!
20, some scattered small components, concrete easy to leakage;
21, the roof partition slot, especially when the overhead insulation layer, cement mortar leveling layer has a partition slot, and in the heat insulation board also need to do partition slot;
22, some of the specifications is easy to le
您可能关注的文档
- 孕前男女双方的准备(Preparation for both sexes before pregnancy).doc
- 孕期倒数100天的衣食住行禁忌(The last 100 days of pregnancy taboo basic necessities of life).doc
- 字符编码知识Unicode、UTF-8、ASCII、GB2312等编码之间是如何转换的(Character encoding knowledge how is the conversion between Unicode, UTF-8, ASCII, and GB2312 encoded).doc
- 字符和字符串(Characters and strings).doc
- 字符编码ASCII,Unicode和UTF-8详解(Character encoding, ASCII, Unicode, and UTF-8).doc
- 孔的工艺(Hole process).doc
- 孝惠皇后张嫣(Empress Zhang Yan, Xiao Hui queen).doc
- 婴儿取名字大全(Baby names).doc
- 孝感城区城市综合改造实施方案(试行)(Implementation plan of urban comprehensive transformation in Xiaogan city (for Trial Implementation)).doc
- 孝歌(Filial song).doc
文档评论(0)