新员工个人年终工作总结范文(Summary of new employees year-end work).doc

新员工个人年终工作总结范文(Summary of new employees year-end work).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新员工个人年终工作总结范文(Summary of new employees year-end work)

新员工个人年终工作总结范文(Summary of new employees year-end work) Summary of new employees year-end work br 2011 is just around the corner. Ive been with the company for over six months, and this is the first time Ive been on the job since I graduated from school. As a new employee, I am very grateful to the company to provide me with a growth platform, let me continue to work in the study, continuous progress, and gradually improve their quality and ability. Looking back over the past six months, the company accompanied me through a very important stage of life, so I understand a lot. I am here to the leadership of the company and master XX and colleagues to express our heartfelt gratitude, you can assist me at work, but also because of your help, I can make in the companys development to a higher level. br after I practice a month of on-site welding, on raw material inspection job, my main duty is responsible for the material inspection work including: responsible for storage, material fault detection and missed; to confirm the material label, is responsible for the correctness of marking transplant; responsible for the accuracy of the main pressure the material components and material size; inspection of first inspection quality problems caused by the mass to be scrapped and responsible; re inspection of materials, responsible in accordance with the provisions set aside the sampling position, fill orders, together with the sample sent chemical and metallographic test, test report and timely retrieval. In the process of raw material inspection, timely inspection conclusion, and transfer card signature in the process; when the quality problems in the process of acceptance, timely feedback, and timely fill out the unqualified report, submit technical departments; the problems of quality disputes, prevention (transfer records library network , please keep this marker). Measures are followed up to verify that failure to do segregation work is the responsibility of the nonconformi

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档