- 1、本文档共27页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浙江应村混凝土面板堆石坝 - World bank uments
ZHEJIANG PROVINCIAL HYDROPOWER DEVELOPMENT AND MANAGEMENT CENTER (THE “CENTER”) AGREED TO PROVIDE THE WORLD BANK DETAILS OF THEIR INSTITUTIONAL CAPACITY BUILDING NEEDS TO EFFECTIVELY IMPLEMENT THE FRAMEWORK PROCEDURES DESCRIBED BELOW. SPECIFICALLY, THE “CENTER” AGREED TO PROVIDE DETAILS BY THE END OF OCTOBER, 2004 ON:
NUMBER OF BRANCH STAFF MEMBERS TO RECEIVE TRAINING
TRAINING SUBJECT MATTER
DURATION OF TRAINING SESSIONS
WHO WILL PROVIDE TRAINING
WHERE TRAINING WILL BE PROVIDED
COST
1 Frame of Environmental Impact Assessment
1.1 Outline of Project
The subprojects of the Project generally should result in minor impacts on environment and they can be mitigated by taking standard measures. As such, the overall Project belongs to the Category B project according to the World Banks operational policy on Environmental Assessment (OP4.01). However, owing to the possibility of great differences of the subprojects in environmental issues, it is possible for some subprojects to have significant environmental issues and if evaluated on their own merit might be required by both the Government of China and the World Bank to require a detailed Environmental Impact Assessment (Category A EIA). Therefore, it is not suitable to prepare a uniform environmental assessment (EA) documentation for all subprojects. The purpose of this framework EA document (Framework Document) is to be used to provide guidance for the environmental assessment process to be followed in evaluating individual subprojects that are to be considered for financial support under the overall Project.
This Framework Document defines the contents, procedures and responsible authority for environmental assessment of the subprojects, whose purpose is to ensure the environmental assessment in compliance with both Chinese laws and regulations and in accordance with World Bank Environmental Assessment policies and procedures as specified in OP/ BP 4.01 (Environmental Assessment).
This procedure covers the followi
您可能关注的文档
- 沿原先冲出的孔边采用材料拉伸的办法形成凸缘.PPT
- 泓明科技股份有限公司泓明科技股份有限公司TEL - VBOX Motorsport.PDF
- 泉南张氏谱系初探.PDF
- 法解释学とは何か.PPT
- 法规名称: 各级学校健康中心设施基准发布/函颁日期: 民国9年0.PDF
- 法律的制定变迁及效力.PPT
- 法兰式热电偶温度计型号TR10-F,带装配式护套 - WIKA Polska.PDF
- 泡沫混凝土轻钢龙骨复合墙板应用技术规程征求意见稿.DOC
- 波动学波动的特性.DOC
- 波发生器柔性滚动轴承的模糊可靠性寿命计算 - 辽宁石油化工大学机械 .PDF
- 《GA/T 2167-2024移民管理机构对外窗口设置规范》.pdf
- 中国行业标准 GA/T 2167-2024移民管理机构对外窗口设置规范.pdf
- GA/T 2167-2024移民管理机构对外窗口设置规范.pdf
- 《GA/T 2182-2024信息安全技术 关键信息基础设施安全测评要求》.pdf
- 中国行业标准 GA/T 2182-2024信息安全技术 关键信息基础设施安全测评要求.pdf
- GA/T 2182-2024信息安全技术 关键信息基础设施安全测评要求.pdf
- 2024-2025学年保险职业学院《形势与政策》期末考试考前冲刺测试卷及参考答案详解【培优】.docx
- 2024-2025学年度贵州工商职业学院《形势与政策》期末考试练习题一套附答案详解.docx
- 2024-2025学年度山西财贸职业技术学院《形势与政策》期末考试考前冲刺练习含答案详解(夺分金卷).docx
- 2024-2025学年安顺职业技术学院《形势与政策》期末考试考前冲刺测试卷【达标题】附答案详解.docx
文档评论(0)