001人工挖土施工工艺(001 construction technology of artificial excavation).doc

001人工挖土施工工艺(001 construction technology of artificial excavation).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
001人工挖土施工工艺(001 construction technology of artificial excavation) Artificial excavation 1 range The process standard is applicable to the excavation of the foundation pit (groove) and pipe ditch of general industrial and civil buildings and structures. 2 construction preparation 2.1 main equipments: a sharp, flat shovel, hammer, trolleys, ladders, picks, crowbar, ruler, slope ruler, small wire or 20 wire etc.. 2.2 operating conditions: 2.2.1 before excavation, the underground pipeline and other obstructions should be found out, and the ground and underground obstacles in the construction area shall be removed and disposed of according to the requirements of the construction scheme. Location of 2.2.2 buildings or structures or the location of the site of the control line (pile), size standards of foundation pile and gray line, must be tested qualified and finished pre screening procedures. 2.2.3 the surface of the site shall be cleaned and leveled, and the drainage slope shall be well prepared. Temporary drainage ditches shall be dug in the construction area. 2.2.4 during the night construction, reasonable arrangements should be taken to prevent excavation or excavation. The construction site shall be equipped with lighting facilities as required, and obvious signs shall be provided in the danger area. 2.2.5 excavation under the water level of the pit (groove), pipe ditch, should be based on local engineering geological data, take measures to reduce the groundwater level, generally down to below the excavation of the bottom of the 50cm, and then excavation. 2.2.6 familiar with drawings, good technical disclosure. 3 operation process 3.1 process: Determine the order and slope of the excavation To Cut along the edge of the line along the gray line To Layered excavation To Trimming groove To At the end of Qing Dynasty 3.2 determine the slope: 3.2.1 in natural moisture soil excavation pit (groove) and pipe ditch, when the depth of excavation does not exceed the following

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档