- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1三管交接班职责以及值班(1 、 three shift shift, duty and shift)
What are the responsibilities of the 1 and three pipe wheels?
(1) responsible for the deck machinery (such as machine and crane windlass, winch) and water separator incinerator, daily maintenance.
(2) responsible for boiler, bilge pump, ballast pump, general pump, daily pump, sanitary pump, fuel tank (cabinet) management.
(3) responsible for boiler and main engine cooling fresh water test and treatment.
(4) responsible for the management of fuel oil, sewage oil and sewage.
See the system documentation, instructions for shipboard work, QSEP-6.0.2-ICR02-2.10
Shift three tube rounds will tell you, should be responsible for what, what should be paid attention to, these things are very important, youd better use a notebook with record
At ordinary times, you should study more. There are a number of reference books on the ship, which can help you understand the operation principle and maintenance of all kinds of machines.
You should pay attention when you are on duty:
1) succession, an engineer will shift attention with the succession told the engineer. Such as the history of accidents, the extent of the work, and the STANDING ORDER of the chief engineer.
2) after taking over, you should check the engine room carefully to ensure that the operation of the machine is working properly, and its various parameters are within the correct range. There are also sewage wells and various pipelines in good condition.
3) if there is any abnormal situation on duty, measures should be taken immediately: ordinary abnormal circumstances, the engineer corrects himself, and if the situation is serious, report to the chief engineer immediately.
Three tube wheels are generally responsible for air compressors, oil distributors, water pumps and pumps. Some companies will also require three tubes to take charge of boilers. Here are a few of my problems
The work of the three pipe wheel before the departure of the vessel
(1) preheat the oil tank
您可能关注的文档
最近下载
- 重度营养不良伴消瘦的护理查房.pptx
- 湖北省孝感市新高考联考协作体2024-2025学年高三上学期9月起点考试化学试题含答案.pdf VIP
- 高二化学《水的电离 溶液的酸碱性与pH》知识点总结以及典例导析.pdf
- 危险源分类标准-GB6441.ppt
- 手工刺绣培训大纲及计划(含教材及课件).docx
- 2024版IATF16949基础知识培训.ppt VIP
- 小学语文二年级上册全部生字字贴高清版.pdf
- 第九届全国青年数学教师优秀课课件安徽—古杨—课件—斐波那契数列与黄金分割.pptx VIP
- 航空航天知识讲座学习课件(共36张PPT).ppt VIP
- DL_T 596-2021 电力设备预防性试验规程.docx
文档评论(0)