埋地给水管道安装的施工方案(Construction scheme of buried water supply pipeline installation).doc

埋地给水管道安装的施工方案(Construction scheme of buried water supply pipeline installation).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
埋地给水管道安装的施工方案(Construction scheme of buried water supply pipeline installation) This article is contributed by kfkfyym DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. On the underground water supply pipeline installation construction scheme of 2009-09-18 09:31 1 in the construction process of positioning line, trench excavation, trench support, outdoor underground pipe, pipeline installation, pipeline based outdoor pipe and piping, pipe piers, pipeline inspection and pressure test, trench backfill and acceptance 2 construction methods and points 1) positioning to determine the position of the center line of pipe line according to the coordinates of the location of the construction drawing design, fixed on the ground with the Longmen plate, and Longmen plate to measure the center point elevation respectively, as the slot, piping on Longmen board to be properly protected, generally not more than 10 meters distance. At the same time, the pipeline center pile and the leveling point are all set by the translation method, which is convenient for observation and use outside the pipeline construction scope. 2) trench excavation A., when the pipeline measuring alignment line is checked correctly, the trench excavation can be carried out. The trench is excavated with mechanical, and the smaller part can be powered by manpower. After the B. trench is excavated, the sump sump shall be dug separately, and the sump shall be removed by the sewage pump. C. excavation pipe ditch bottom minimum width: note 1.: table D for pipe outer diameter. 2. when the support groove is arranged at the trench depth within 2 meters, the ditch width increased 0.1 meters; at a depth of 3 meters, width of trench bottom increased 0.2 meters; 3. by mechanical excavation groove, the groove width according to the size of the cutting excavation machines and decide, but not less than the specified value. 3

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档