- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HIGH TENSION LOAD TRANSFER USING BORED (高压负荷转移使用无聊)
HIGH TENSION LOAD TRANSFER USING BORED PILES FOR
SOUL Apartments, Surfers Paradise
Martin Larisch
Piling Contractors Pty Ltd
ABSTRACT
This paper describes two different methodologies of transferring high tension loads through large diameter bored piles into the ground. The
installation of post tensioned stress bars into the piles was considered as one option for the SOUL project however the use of high strength concrete
(f ` ≥ 85MPa) for the pile shaft had some essential advantages.
c
The use of high strength concrete for bored piles has hitherto been considered to be problematic. Workability criteria have to be maintained for
several hours in order to achieve the required quality. Possible concrete shrinkage of the pile shaft causing cracks, concrete bleeding as well as an
ongoing quality control of the concrete mix are only a few of the challenges that have to be considered.
This is particularly the case for the foundation piles of a high rise building where extremely high point loads are transferred through the piles into the
ground. All piles have to be constructed to extremely high standards. In most cases geometry constraints and the design requirements of the
superstructure make it impractical to install additional piles in the event that a pile does not achieve the required capacity and has to be supported or
replaced by an adjacent pile.
Figure 1: Location of the SOUL project in Surfers Paradise, QLD, Australia
您可能关注的文档
- Haptic Feedback Steering Wheel University of (触觉反馈方向盘大学).pdf
- Harley Davidson 2002 Sportster 1200c Service (哈雷戴维森2002 Sportster 1200 c服务).pdf
- HARDWARE IMPLEMENTATION OF THE (硬件实现的).pdf
- HARMONICS AND HOW THEY RELATE TO (谐波,以及它们是如何联系的).pdf
- Harmonic Driveactuator(谐波Driveactuator).pdf
- Harry’s Tool Box Judy Kitson(哈利的工具箱朱迪凯特森).pdf
- HARVONI (harVOEnee) (ledipasvir and (HARVONI(harVOEnee)(ledipasvir和).pdf
- Hay Tool Rotary Cutter Blades Powell's (干草旋切机刀片鲍威尔的工具).pdf
- Hardrock Tunnel Boring Machines Apache2 (重金属隧道钻孔机输入).pdf
- hazard classification 6 28 10 Mass.Gov(风险分类6 10 Mass.Gov 28).pdf
文档评论(0)