- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
High Temperature Polymer Capacitor Dielectric (高温聚合物电容器介质)
High Temperature Polymer
Capacitor Dielectric Films
Leah Appelhans, Shawn Dirk
Sandia National Laboratories
May 15, 2012
APE009
This presentation does not contain any proprietary, confidential, or otherwise restricted information
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned
subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energys National Nuclear Security Administration under
contract DE-AC04-94AL85000.
Overview
Timeline Barriers
• Project start: October 2009 • Barriers
• Project end: September 2012 – Capacitor Cost (up to 23% of
inverter)
• Percent complete (100%) – Thermal control
– Volume (up to 23% of inverter)
Budget
• Total project funding Partners
– DOE: $2800k • Electronic Concepts, Inc.
• Funding received in FY09- • Sandia National Laboratories
FY12 include:
• FY09 - $350k • Penn State
• FY10 - $750k • Argonne National Laboratories
• FY11 - $850k
• FY12 - $850k
2
Project Relevance
• The Problem
DC bus capacitors are currently the largest and
the least reliable component of fuel cell and
electric hybrid vehicle inverters. Capacitors
represent up to 23% of both inverter weight and
inverter cost and up to 35-40% of the inverter
volume. In addition current thin
您可能关注的文档
- HARDWARE IMPLEMENTATION OF THE (硬件实现的).pdf
- HARMONICS AND HOW THEY RELATE TO (谐波,以及它们是如何联系的).pdf
- Harmonic Driveactuator(谐波Driveactuator).pdf
- Harry’s Tool Box Judy Kitson(哈利的工具箱朱迪凯特森).pdf
- HARVONI (harVOEnee) (ledipasvir and (HARVONI(harVOEnee)(ledipasvir和).pdf
- Hay Tool Rotary Cutter Blades Powell's (干草旋切机刀片鲍威尔的工具).pdf
- Hardrock Tunnel Boring Machines Apache2 (重金属隧道钻孔机输入).pdf
- hazard classification 6 28 10 Mass.Gov(风险分类6 10 Mass.Gov 28).pdf
- Hazards of Transporting Petroleum by Road (运输石油的危险道路).pdf
- Hazardous Area Classification in Oil Gas (危险区域分类在石油和天然气).PDF
最近下载
- 全员专项学习培训试题题库单选、多选试题附答案.doc VIP
- 6_7_理论塔板数的计算.ppt
- 政府采购项目招标代理机构服务 投标技术方案(技术标).docx VIP
- GBT18851.6-2014无损检测渗透检测第6部分温度低于10℃的渗透检测.pdf
- 2024年华医网继续教育护理学基于循证理念的临床护理管理实践新进展题库及答案.docx VIP
- 过敏性休克【29页】.pptx
- 某工程监理规划.doc
- YD_T 1484.1-2016无线终端空间射频辐射功率和接收机性能测量方法 第1部分:通用要求.pdf
- 封闭板成形模及其冲压工艺设计.doc VIP
- 涉密信息系统安全建设方案.docx VIP
文档评论(0)