- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
I-ANR-275D INSTALLATION OPERATING ... - (i - anr - 275 d的安装和操作。)
I-ANR-275D
INSTALLATION OPERATING INSTRUCTIONS
for
SUNNEN® ANR-275 REMOTE-FEED HONE
Includes Repair Parts List
GENERAL POWER SOURCE
The ANR-275 Hone has been designed to hone bores Use heavy duty electric drill in a honing rig, or drill
from 2.50 to 21.00 in. (64 - 533 mm) diameter. press (see Figure 1). To establish optimum rpm for
your application, divide 800 by the hole diameter in
NOTE: For light work in bores larger than 10 in. inches.
(254 mm) in diameter.
Example: 800 + 4 = 200 (rpm); or divide 20,000
by the hole diameter in Millimeters.
INSTALLATION
Example: 20,000 + 100mm = 200 (rpm).
The Remote-Feed Hones are designed for use in a
rigid installation, such as a drill press or a honing Hole Size Recommended Drill
rig, where part to be honed and power source are 2.5 to 5 in. (63 - 130mm) . . . . 5/8 in. (15mm) capacity
rigidly fixed (see Figure 1). The ANR-275 is 5 to 15 in. (130 - 380mrn) . . . . . 3/4 (19mm) capacity
equipped with two Universal Joints which allow 15 in. up (380mm up) . . . . . . . . 1 (25mm) capacity
the honing head to align itself with the workpiece.
FIGURE 1, Honing Rig
SUNNEN® PRODUCTS COMPANY • 7910 MANCHESTER ROAD • ST. LOUIS, MO 63143, U.S.A. • PHONE: 31
您可能关注的文档
- How to Control Liquid Ring Vacuum Pumps (如何控制液环真空泵).PDF
- HOW TO BUILD A TOP BAR HIVE Beginning (如何构建一个顶级酒吧蜂巢开始).pdf
- How to Diagnose Cure a Clicking Starter N (如何诊断和治愈点击起动 N).pdf
- How to find hidden cameras Franken(如何找到隐藏的摄像机弗兰肯).pdf
- How to Determine NPT (National Pipe Thread) Size(如何确定不扩散核武器条约》(国家管螺纹)大小).pdf
- How to Determine Water Pump Rotation (如何确定水泵旋转).pdf
- how to inspect a home Cornell College of (如何检查一个家康奈尔大学).pdf
- How to Install metal lath CS Stucco Plaster(如何安装金属板条 CS灰泥和石膏).pdf
- How to interpret the sRGB color space (specified (指定的sRGB色彩空间(如何解释).pdf
- How to install bevel gears for peak performance (如何安装锥齿轮峰值性能).pdf
文档评论(0)