新型独立小型水电可再生能源系统课件.ppt

新型独立小型水电可再生能源系统课件.ppt

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Novel Stand-Alone Small Hydro Renewable Energy System;Outline;The Hydro Power Advantage ;Canada’s Role as a Hydro – Power Producer;The Classification of the Hydro-Electric Systems;The Capacity-wise Categorization;By Types of Installation;Type of Turbines ;Reaction Type Turbines;Kaplan Turbines;Impulse Type Turbines;Turbines can be split into four main groupings (although they do of course overlap and one may disagree on where one group starts and ends). ;The Nominal Power Capacity of a Small Hydro Power System;Starting the Simple Power Calculations;AN EXAMPLE OF A TYPICAL CALCULATION [Lower Kotmale Project, Sri Lanka];Why Hydro – Power is renewable? Hydropower is considered a renewable resource because water, which nature makes available each year through the hydrologic cycle, is used as the energy source to generate power. Rural Electrification Policy ? The important part of Rural Electrification is the mobilization of Renewable Energy (RE) sources, where they are cost-effective, and the promotion of RE technologies ;How to Electrify Rural Areas or Best Sources for a Stand-Alone System ;Again, the Small Stand-Alone Hydro Power Systems can be divided into TWO Main categories : ;The Traditional way of achieving (CV – CF) Constant Voltage, Constant Frequency in Stand-alone Asynchronous Generator run Hydro Power System ;The Research Tasks;The Sample VV – VF Stand-Alone Small Hydro System System has Linear, Non Linear and machine Loads How you solve the Reactive Power problem, as you are dealing with an asynchronous generator? Where are those Traditional Dumb Loads? Why Matlab / Simulink? But, not Matlab, C or Fortran programming?;Sample Study Stand–Alone Small Hydro Power System;The Hybrid Load Centre;The Modulated Power Filter and Capacitor Compensator [MPF / CC] How you select R? The Carrier Frequency? Why IGBTs/Mosfets? Can’t I go for GTOs or Thyristors or IGBTs?;The New Proposed Way : Novel Modulated / Switched Power Filter and Compensator Capacitor ;;The Pow

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档