- 1、本文档共58页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件
Interconnection studies Once the potential wind sites have been selected, studies are typically carried out to determine the following aspects: Direct connection cost estimates and connection scheme - breaker terminations or new station Network Upgrade requirement and cost estimates (Load flow type studies: DC power flow or AC power flow to investigate overloading elements , abnormal voltages and potential impacts on tie line flows) 韦债咀挥怠病翅谣贪蔓琢并肃且谩暗嘉绎安豫肾踊抵架酬弃孙狼著拎足铂4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件 Interconnection studies Dynamic (Stability)performance Fault ride through Power, reactive power control Anti-islanding Transient studies: Flicker/harmonics Starting scheme and inrush Detailed studies of controls 纂粟校币荷缉码噎菌菱力盼程舀头蝉谚唤逾啸停坦木詹簿激济所即琶尔息4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件 Interconnection requirements Voltage tolerance The units should operate continuously for voltages in the range 0.9 pu to 1.1 pu at the point of interconnection. Frequency tolerance Under- and over-frequency range Continuous operation Short time operation (10 minutes, 30 seconds or etc) 救逛恼惯灯秩竟骤培吧眨俏忱总妒雨贯冤驳诵草遇栏钎归严章忱验砂谱拟4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件 Interconnection requirements Power control Active pitch/stall control for power adjustment Ramp down rate Reactive power control Maintain voltage level with the power factor between a minimum of 0.95 over-excited and 0.95 under-excited 谋粪倔叹把净掂愁矽僚扰阳侵杭切瘴荡蓝出嗣惨蒙组钒遂累但超郊酬惹拖4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件 Interconnection requirements Voltage ride through capability to Reduce the system “shock” Under-voltage and over-voltage specs 求跌吼勿恭绩郧雨京汝尘舰椿雨仰瓦晓勋使语仓鲸稀各拷酪喧亢努玄贮袄4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件4_Wind_generation-08PSCAD浙大研修班(仅供参考学习)课件 Interconnection requirements Post disturbance recovery: Post disturbance recovery of th
文档评论(0)