Work-term Report (实习工作报告)
Site Inspection for People Hospital in Xiaolan Town
Prepared by
Howard He
Submitted to
Nicholas Petryszak, Co-op Coordinator
Mech 6090
Course date: Ten months
Company Name: Xiaolan Fire Protection Engineering Co., Ltd.
Company address: 57 Jitou Road, Xiaolan Town,
Zhongshan City, Guangdong Province, China P.R.C.
Date of Report: 27th August 2012
Summary
I was employed at Xiaolan Fire Protection Engineering Co., Limited,(Xiaolan) located in Zhongshan City, Guangdong Province, China P.R.C. from October, 2009 to June, 2010 and June 1st 2012 to 27th August 2012 as a student mechanical engineer. Zhijian Zhang was my supervisor in the company and he was an expert in plumbing and HVAC. Xiaolan is the towns leading plumbing supplier and assembler. The company was founded at August 1994, and it undertook some big projects in local area in Zhongshan city.
My primary task while employed was to read and interpret blueprints, drawings and specifications; Locate and mark position of pipe connections, holes and fixtures; determine piping system requirements and pipe sizing. In the first two weeks, I studied the building code in order to understand the standard in China. After that, I modified the drawing by using AutoCAD software based on supervisor requirement. After a month later, I start inspection in worksite with supervisor. I needed to locate and mark any position of the pipe connections, holes, and fixture for any changes. After the inspection, I have to write a log or report to inform any modifications to my supervisor. Table of Contents
Site Inspection for People Hospital in Xiaolan Town i
Summary ii
Table of Contents iii
Table of Figures iv
Introduction v
Study the Chinese standard building code ix
Read and interpret blueprints drawings and specifications; xi
Locate and mark position of pipe connections, holes and fixtures; xiii
Determine piping system requirements and pipe sizing. xiv
Write progress log and report and meeting memo xv
Personal Observation xvi
您可能关注的文档
- Where is the post office课件.ppt
- Will_people_have_robots课件1 reading.ppt
- win7 64位系统下错误1067导致无法使用无线网络的解决办法.pptx
- Win7专业版系统下磁盘是否出现坏道的检查方法.pptx
- Win7系统安装.net framework后提示HRESULT 0xc8000222错误.pptx
- Win7系统安装失败的原因.pptx
- Windows7旗舰版系统文件出现损坏无法修复如何解决.pptx
- Windows Server 2008 R2 部署 Exchange 2013.docx
- Windows进程编程.ppt
- WINDOWS系统安全知识.ppt
文档评论(0)