- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1)
室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1)
This article is contributed by liyunweb
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Indoor plastic drainage pipe installation scheme, indoor plastic drainage pipe installation construction scheme construction
1 material requirements: 1.1 pipe is rigid polyvinyl chloride (UPVC). The adhesive used shall be the same product in the same factory. It shall be suitable for sanitary fittings, and shall have the product qualification certificate and instruction manual. 1.2 pipe outside surface should be smooth, no bubbles, cracks, wall thickness, consistent color 2.1.3 other materials: adhesives, steel, round steel, card, bolts, nuts, soap etc.. 2.2 main equipments: 2.2.1 electric drill, impact drill, hand saw, milling mouthparts, steel scraper, wrench, hammer, horizontal ruler, threading plate, brush, cloth, wire, etc.. 2.3, operation conditions: 2.3.1 buried pipe, should dig groove, groove to flat, must have slope, ditch bottom ramming. 2.3.2 concealed piping (including equipment, shaft, ceiling pipe) should first check the elevation of various pipelines, coordinate arrangement, whether there is no contradiction. Reserved holes have been completed with embedded parts. The civil formwork has been removed, the operation site has been cleaned up and the installation height is over 3.5m. A good shelf should be erected. 2.3.3 indoor installation piping shall be installed at intervals of two layers from the progress of the structure. Indoor horizon should be good, early decoration plastering project has been completed. Installation site accessibility.
3, operation process
3.1 process: ready to install, prefabrication, installation, pipe riser installation, pipe installation, card, fixed sealing plugging hole, closed water test, water test 3.2 prefabrication: according to drawings and combined with the act
您可能关注的文档
- 天涯来吧 - 驾驶 - 七种技巧轻松停车(End of the world come - drive - seven skills, easy parking).doc
- 天然的化妆品、护肤品知识大全(Natural cosmetics and skin care products.).doc
- 天线溃电点计算(Calculation of breakdown point of antenna).doc
- 天线的基础知识(Basic knowledge of antennas).doc
- 天语指令(Amagatarai instruction).doc
- 太原客运段防寒过冬安全题库(Taiyuan winter passenger depot cold winter safety item bank).doc
- 太原市将采用城市集中供热节能服务系统(Taiyuan city will use the central heating energy-saving service system).doc
- 太子参种植新技术(The new planting techniques of Radix Pseudostellariae).doc
- 太极相对论(Tai Chi theory of relativity).doc
- 太阁立志传5 特殊武将卡获得(II taikourisshiden 5 special generals cards).doc
文档评论(0)