室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret).doc

室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret)

室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Net, water and electricity free download A, One Construction preparation Dry pipe installation: located in the trunk of the dry pipe, should be cleared of debris in the trench, and install the hanging crane, card rack, not covered ditch cover before installation. A dry pipe located below the floor and at the top shall be installed after the top of the structure or above the first floor of the installation. 2., 3.1, 2, 3, standpipe installation must be carried out after determining the correct elevation. The installation of branch pipe must be done after plastering. Pipe: carbon steel tube, seamless steel tube. Pipe material shall not be bent or rusted without flying thorns, heavy leather and uneven surface. Fittings: unbiased buckle, square buckle, disorderly buckle, broken wires, no blisters, cracks and inaccurate angles phenomenon. The valve casting rules, no burr, no crack, flexible switch tight, thread without damage, the straightness and the right angle, the strength meets the requirement, the hand wheel without damage. Installation should be carried out before the strength and tightness test, the main control valve 100% test, other valve sampling 10%, if not qualified, then check 20%, there are substandard, then one by one inspection. 4, 5, 6, and other materials: steel, round steel, pipe clips, bolts, nuts, oil, hemp, mats, electrical welding rod, etc.. Selection should comply with the design requirements. The cast iron shut-off valve is not allowed in the interior part of the housing project. Various types of pipes, valves, regulators, insulation materials should be product quality certificate and material inspection report, heat meter should have measurement verification certificate. (I) operating conditions (two) mate

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档