施工总平面布置(General layout of construction).doc

施工总平面布置(General layout of construction).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工总平面布置(General layout of construction)

施工总平面布置(General layout of construction) General layout of construction I. the function of the general construction plan The general plan of the building is the general layout of the construction site of the proposed project. According to the construction plan and schedule requirements, the construction site of the road traffic, material warehouse, affiliated enterprises, temporary housing, temporary water pipeline make the layout reasonable, so as to correctly handle the relationship between the space required during the whole construction site facilities and buildings, the construction of the quasi permanent. The rendering ratio is typically l:1000 or 1:2000. Two, the contents of the general construction plan The main contents of the general construction plan are as follows: 1, the original topography and contour lines, all existing ground, underground buildings, structures, railways, roads and pipelines; 2 all proposed permanent structures, structures, roads and pipelines; 3. All temporary facilities for construction (see Chapter sixth); 4, permanent and semi permanent coordinate positions, soil sampling and soil dumping location. Three, construction general plan design steps are as follows (I) introduction of off-site traffic 1, when a large number of goods transported by the railway site, should first solve the railway where to introduce and how to layout problems. When there is no permanent railway special line in the yard, it can be built in advance so as to serve the construction of the project. But because of the introduction of the railway will seriously affect the transportation and safety, so the railway construction site, introduced should be close to one side or both sides of the site; only when the large site is divided into several independent area construction, railway can lead the central site, at this time, the railway should be located in each area of the side. 2, when a large amount of material from the water into the scene, should make full use

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档