- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three))
施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three))
Safety technical operation rules for construction site (three)
I. steel worker
1., steel production process using rebar machinery, to strictly abide by the rules of mechanical operation, in order to prevent mechanical wounding and electric shock accident.
2., the straightening of steel: the card should be locked, the anchor to be strong and firm, pull along the tendons along the left and right sides within 2 meters of the forbidden pedestrian, iron cutting machine, bending, bending machine should be handled by skilled workers.
3. installation of steel, according to the location map construction, be firmly connected to the right, protective layer pad to meet the requirements, in the pouring of concrete, steel industry to follow operation, ensure the reinforcement does not shift, ensure the thickness of protection layer.
4., when moving steel bars in place, the vertical transport should be firmly tied to prevent falling wounding, passing steel bars to prevent high voltage lines and other facilities, in case of accidents.
5. when installing side columns, side beams and side wall reinforcement, the operator must operate on a secure platform with railings, and never risk his work.
6., the installation of steel must be based on the bottom, column base, beam bottom and surface cleaning debris.
Two carpentry
1. before work check the use of tools is good, storage is appropriate, so as not to fall hurt people, to prevent nails, feet and air slide.
2. installation and removal of more than 5 meters of the template, should be erected scaffolding, and set up protective railings.
3. may not pile up a large number of templates and other materials on the scaffolding.
4. the mould process, such as the way to stop, should be the first support plate, stigma nail.
5. if there are any holes in the template, the template should be covered after installation.
6., support, etc., shall not be built on the doors a
您可能关注的文档
- 所得税前可以扣除的项目(Deductible items before income tax).doc
- 所得税,带征与查征(Income tax, levy and check).doc
- 所有大题(All big questions).doc
- 手动修复exe关联(Manual repair of exe associations).doc
- 手写识别技术(Handwriting recognition technology).doc
- 手动张力控制器(Manual tension controller).doc
- 手工丝印(Hand screen printing).doc
- 手工打造个性文件夹(Create personal folders by hand).doc
- 手机万能充电器电路原理与维修(Circuit principle and maintenance of mobile phone universal charger).doc
- 手术疤痕(Surgical scar).doc
最近下载
- 四川省2004年肺结核流行特征及空间聚集性分析.pdf VIP
- 《小肠梗阻的诊断与治疗中国专家共识(2023版)》解读.pptx
- 回收、暂存、中转废矿物油与含矿物油废物项目突发环境事件应急预案.docx
- 电路与电子学-课程教学大纲.doc VIP
- 安徽省A10联盟2023-2024学年高二上学期11月期中考试物理试题及答案.pdf
- 第三届全国新能源汽车关键技术技能大赛(汽车电气装调工赛项)考试题库资料(含答案).pdf
- 国家科技创新政策汇编 202305.pdf
- 东华大学819有机化学2018年考研真题.pdf
- 精品推荐企业财务制度通用版汇总.docx
- 2016年东华大学硕士研究生入学考试819有机化学考研真题.pdf
文档评论(0)