- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
考题2(Examination questions 2)
考题2(Examination questions 2)
A1,
1, interior walls, cylinder and door opening corner approach should meet the design requirements, it should be used (1:2) cement mortar; height should not be lower than m (2); each side width of not less than mm (100).
2, plastering engineering of different materials substrate handover surface plastering, should take preventive measures to crack, and when using strengthening nets, strengthen the mesh and each matrix overlap width shall not be less than (100) mm.
3, doors and windows engineering, building exterior walls, metal windows, plastic windows to its (wind resistance performance), (air permeability) and (rain seepage performance) and other performance indicators for re examination.
4, the underground engineering waterproof technical specification on strengthening belt is defined as: (in the original setting expansion joint or after pouring site, set aside a certain width, the expansion ratio of concrete and concrete pouring and adjacent parts.)
5, underground engineering, cement mortar, waterproof layer, concrete base strength level shall not be less than (C15).
6, underground engineering, polymer cement waterproof mortar should be mixed in (0.5) H used up, and in construction shall not arbitrarily add water.
A2,
1, the ceiling material should be installed firmly and closely, and the overlap between the finish material and the keel should be greater than the width of the force surface of the keel (2/3).
2 residential building waterproof construction, toilet and kitchen, balcony should use waterproof, waterproof construction of joint of glass fiber cloth should be smooth (along the flow direction) lap, lap width not less than mm (100). Construction of two or more glass fiber cloth, the upper and lower joints should be staggered width (1/2) times.
3. Wet paving method should be applied to the natural stone material (against alkali and back coating).
4, coating waterproof layer roofing construction, the isolation layer is set as
您可能关注的文档
- 地震前兆(earthquake precursor).doc
- 美丽女人的华彩霓裳(Colorful neon beautiful woman).doc
- 地震征兆(Earthquake omen).doc
- 美剧常见词(Common words in American drama).doc
- 美发话术(Hairdressing talk).doc
- 美国ni仪器公司产品ni labview 2014 v14.0.1(美国镍仪器公司产品NI LabVIEW 2014 v14.0.1).doc
- 美国人的赚钱高招(American money making ideas).doc
- 美国人造鸡蛋(American made eggs).doc
- 美国俚语(american slang).doc
- 美国特享腺体元素资料(Information on gland elements in the United States).doc
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)