肇庆110千伏宾亨变电站电气安装工程(Zhaoqing 110 thousand volt substation bin Heng electrical installation engineering).doc

肇庆110千伏宾亨变电站电气安装工程(Zhaoqing 110 thousand volt substation bin Heng electrical installation engineering).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
肇庆110千伏宾亨变电站电气安装工程(Zhaoqing 110 thousand volt substation bin Heng electrical installation engineering)

肇庆110千伏宾亨变电站电气安装工程(Zhaoqing 110 thousand volt substation bin Heng electrical installation engineering) Zhaoqing 110 thousand volt substation bin Heng electrical installation engineering Prequalification document for bid applicants Bidding unit: Zhaoqing Power Supply Bureau of Guangdong Grid Co Guangzhou Electric Power Technology Consulting Co., Ltd. Two o o June I. General Situation of the project: Project Name: Zhaoqing 1, 110 thousand volt substation bin Heng electrical installation engineering 2, the scale of the project: Including installation of 2 sets of 4 KVA three-phase double winding transformer, and equipped with corresponding capacity of reactive compensation capacitor and other ancillary equipment (excluding 110 thousand volt communication part). 3 、 engineering address: Zhaoqing City 4, the expected contract price: about 5 million 124 thousand yuan. 5. Scheduled completion date: November 30, 2010; Two documents of Prequalification documents shall be submitted in the following order and format: 1, cover (in accordance with Annex 1 format); 2, directory; 3 application for prequalification (in accordance with Annex 2 format); 4. The certificate of the legal representative (in the form of Appendix 3) and the power of attorney of the legal person (in the form of Appendix 4); 5 copies of the business license, the enterprise qualification certificate and the copy of the enterprise s safety production license (original for future reference); 6, the companys performance and awards: In 6.1 and 2007-2009, the enterprise takes on a list of 110 thousand volt and above substation project performance (in accordance with Annex 5 format); In 6.2 and 2007-2009, the enterprise shall bear a copy of the project performance of 110 thousand volts and above (provided in the form of a list, with reference to the original); 7, to send the project person in charge of the project (must be two or more registered construction division): 7.1 introduction 7.2 construction division qua

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档