装修的施工工艺及其具体材料和主材(The construction technology and specific materials and decoration materials).doc

装修的施工工艺及其具体材料和主材(The construction technology and specific materials and decoration materials).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
装修的施工工艺及其具体材料和主材(The construction technology and specific materials and decoration materials)

装修的施工工艺及其具体材料和主材(The construction technology and specific materials and decoration materials) The construction technology and specific materials and decoration materials Construction technology of grid ceiling 1. construction process: The bomb - wire - line standard ceiling above elevation brush black paint - Installation of water and electricity, ventilation pipe installation - circle - metal grille ceiling installation of mineral wool board - ceiling arching position and height -- at springline ceiling sprinkler head height adjustment, equipment debugging -- height adjustment metal grille - straightening fire the spray head straight - mounted luminaires -- fine grille straight arch at. 2. ceiling plane position find rules: because various shopping malls things 120m long, north-south width 34.7m, column spacing 8.0m*8.0m, the area is larger, so must deal with a metal grid ceiling, mineral wool board, between the ceiling and wall, column vertical or parallel relationship, which should be related to the measuring axis to column wall facade, and according to the datum line pull to find rules so as to ensure the wall plastering, both cylindrical and parallel to the axis, and two adjacent faces perpendicular to each other. This is used as the datum plane of the ceiling plane. 3. grille ceiling arch and arch height: the vertical size should not be too long because of Engineering arch, the arch should be in the short north-south direction to the arch height by about 1 / 200 8m zhuju. The plane position and not the 4. grid fire sprinkler overlap, and should be two directions should be straight, this can be in the upper end of the vertical tube is made of fire sprinkler is greater than 900 of the pedal bend to adjust spray head position. 5.: check the hole indwelling equipment for various pipelines in the grille ceiling is provided with an adjustable valve, check the hole shall be retained in the corresponding position, and check the hole position and not in this aspect, ca

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档