西南交《施工管理与预算》在线作业二(Southwest construction management and budget online homework two)
西南交《施工管理与预算》在线作业二(Southwest construction management and budget online homework two)
Southwest construction management and budget online homework two
Total score: 100 test time: -
Radio examination
A multiple-choice question
Radio examination questions (10 questions, 40 points)
1. no code (or line) is allowed in the code number network diagram.
A. key
B. is not critical
C. cycle
D. acyclic
Full marks: 4
2., budgetary estimate quota is the basis of organization ().
A. construction drawing budget
B. construction plan
C. project budget
D. construction budget
Full marks: 4
3. the maximum economic range of vertical soil movement is the comparison of the cost of longitudinal soil excavation to the fill and the cost of the horizontal earth moving ().
A. borrow earth
B. spoil soil
C. borrow the earth and spoil the soil
D. fill
Full marks: 4
4., the primary function of construction enterprise management is ().
A. supervision
B. plan
C. tissue
D. command
Full marks: 4
5., three yuan three indicators in the material refers to ().
A. steel, wood, masonry
B. steel, wood, cement
C. wood, cement, masonry
D. wood, lime, cement
Full marks: 4
6., the construction organization scheme should be comprehensive research, selection, and put forward the best program.
A. technical feasibility and economic rationality
B. technology possibilities
C. schedule requirements
D. economic rationality
Full marks: 4
7. construction enterprise management is the construction enterprise () activities in the management of the floorboard.
A. quality control
B. schedule control
C. production and management
D. investment control
Full marks: 4
8. construction organization design is engineering construction.
A. chart project
B. master plan
C. basic data
D. component
Full marks: 4
9. a line segment of an arrow is not allowed in a double sign network diagram.
A. unidirectional
B. bi directional or no
No C.
D. bidirectional
Full marks: 4
10. () management is the leading link of construction enterprise management.
您可能关注的文档
- 美文许达然(Xu Daran).doc
- 美术艺术生的就业方向(The employment direction of art students).doc
- 美国大学心理学专业简介(Introduction to psychology in American Universities).doc
- 美白产品推荐(Whitening products recommended).doc
- 美女养生~~食补(Beauty and health food.).doc
- 美容小知识点(Beauty tips).doc
- 美的电磁炉散件维修技巧与方法(The electromagnetic oven parts maintenance methods and skills of beauty).doc
- 美的冰箱进苏宁电器(Midea refrigerator, Suning Appliance).doc
- 美白牙齿(Whitening teeth).doc
- 美白食物(Whitening food).doc
文档评论(0)