设计应注意的问题(Design should pay attention to the problem).doc

设计应注意的问题(Design should pay attention to the problem).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
设计应注意的问题(Design should pay attention to the problem)

设计应注意的问题(Design should pay attention to the problem) Problems to be noticed in concrete structure design 1. the seismic grade selection error of concrete structure. 2. no definite number or elevation of bottom reinforcement zone. 3. the high-rise building structure with transfer floor at the bottom and the strengthening part at the bottom of the shear wall. According to the technical specification for concrete structure of high-rise building Cheng, JGJ3 - 2002, section 10.2.4: a high-rise building with a transfer floor at the bottom. The height of the reinforcement at the bottom of the shear wall can be removed The height of the supporting layer and the height of the two layers above the frame support layer and the total height of the wall limb are the larger values of the 1/8 two. 4. the restrained edge component is not consistent with the technical specification for concrete structures of high-rise buildings, JGJ3 - 2002 7.2.16 strip. (including stirrups and length of Lc) 5. top plate negative reinforcement with 6@200, does not comply with the code for design of concrete structures GB50010--2002 10.1.7. For: Branch The cast-in-place concrete slabs which are integrally cast or embedded in the load-bearing masonry walls shall be equipped with reinforcing steel bars along the supporting periphery The diameter shall not be less than 8mm, the spacing shall not be greater than 200mm, and the following requirements shall be met:... 6. large span beams and plates do not carry out the calculation of cracks. 7. when calculating, the seismic shear force of frame columns in frame shear structure, frame core tube structure and frame supported shear wall structure should be based on the high-rise Technical regulations for building concrete structures, JGJ3 - 2002, 8.1.4, 9.2.3 and 10.2.7 are adjusted. 8. the problem of wall pulling reinforcement: the spacing of tension bars is not the multiple of the distribution bars. Lambda /2 (including constrained edge elements of seismic w

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档