重庆大学工民建本科2010年秋季学期路桥工程施工第二次作业_百度文库...(Chongqing University civil engineering undergraduate in 2010 Fall semester of Luqiao engineering and construction operations of the second _ Baidu library...).doc

重庆大学工民建本科2010年秋季学期路桥工程施工第二次作业_百度文库...(Chongqing University civil engineering undergraduate in 2010 Fall semester of Luqiao engineering and construction operations of the second _ Baidu library...).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
重庆大学工民建本科2010年秋季学期路桥工程施工第二次作业_百度文库...(Chongqing University civil engineering undergraduate in 2010 Fall semester of Luqiao engineering and construction operations of the second _ Baidu library...)

重庆大学工民建本科2010年秋季学期路桥工程施工第二次作业_百度文库...(Chongqing University civil engineering undergraduate in 2010 Fall semester of Luqiao engineering and construction operations of the second _ Baidu library...) This article is contributed by lovemindme DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. The autumn of 2010 Luqiao construction second operations, a single choice (10 points, a total of 5 questions, each question 2 multiple-choice questions (1. points) in the greenhouses in masonry masonry block temperature should be (above). A. 10, B., 3, C., 5, D., 15, 2. assembly arch bridge component, in the stripping, moving, stacking, lifting, the strength of concrete should not be less than the design requirements of strength, generally not less than the design strength (). A., 75%B., 80%C., 85%D., 65%3., concrete strength should be released (), after the release, such as surface defects, should be repaired in a timely manner. A. 0 to 0.3MPa B. 0.2 to 0.5Mpa C. 0.25 to 0.6Mpa D. 0 to 0.5MPa 4. for quality assurance should fill compaction (A.) natural water content B. maximum water content C. minimum water content D. the optimum moisture content of 5. post tensioned tendons with stretch at both ends, with one end (A.) anchor screw end the other end is also used anchor rod, screw anchorage; B. end with help anchor, the other end with screw end anchorage rod; C. end upsetting anchorage. The other end with screw anchorage; with the help of D. end anchorage, the other end with a head anchor. Fill in the blanks (two, fill in the blanks (20 points, a total of 10 questions, each question 2 points) 1. composed of roadbed width, and three. 2. the ordinary steel bars used in concrete structures can be divided into two categories according to the production process. 3. the earthwork can be used when calculating earthwork using a grid. 4. precast concrete block method has long-term precast an

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档