- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
银河电力(Galactic power)
银河电力(Galactic power)
The Milky Way Xian Power Electronic Communication Co. Ltd. was founded in 1995, over the years the company has always been in power engineering construction mainly in electric power engineering technology development, demonstration, design, service, construction, installation and commissioning as one of the Integrated Company.
The company is located in Xian, a city with a long history. The company registered capital of 40 million yuan. Registered address: Xian high tech Zone, maple leaf new city C3 Building 2 unit 3 floor No. 2301; branch registered address: Weiyang road Xian Saigao international D No. 126 room 1901. The companys existing engineering and economic management staff of 160 people, including engineering and technical personnel 120 people; engineering and technical personnel, with intermediate or above titles of staff of not less than 80 people. Have two class qualification above, build division 18 people. The company has a group of enterprising, experienced professional engineering technology and management personnel. The company has a full range of construction equipment, machinery, advanced testing instruments and meters, has a skilled, serious work, hard-working professional construction team.
The company has the power engineering construction general contracting two qualifications, installation (repair, test) power facilities permit (holding two grade, two grade, repair test level Four) and other qualifications. The company has passed the certification of quality, environment and occupational health and safety management system.
The organization and management, improve the efficiency of advanced equipment and experienced staff, with many large power engineering construction at the same time, by the end of 2011 the company has completed the 110kV and below power transmission lines (including cable engineering) and the same voltage substation engineering, cable and satellite ground receiving facilities design installation engineer
您可能关注的文档
- 角线新闻(Corner news).doc
- 角色的构思(Role conception).doc
- 西方经济学复习重要提纲(Review important outline of Western Economics).doc
- 解决上网问题(Solving Internet problems).doc
- 解决按和旋困难(Solve the problem of press and spin).doc
- 解决硬盘引导型故障(Hard disk boot fault).doc
- 解决游戏不能全屏的问题(Solve the problem that the game cannot be full screen).doc
- 解决能上qq但不能打开网页(Resolve to access QQ but cannot open web pages).doc
- 解放思想强化措施推动招商引资工作再上新水平(Emancipate the mind, strengthen measures to promote the work of attracting investment to a new level).doc
- 解析2011年led居室照明灯具设计四大宗旨(Analysis of the 2011 led bedroom lighting design four major purposes).doc
文档评论(0)