阀门流量试验(Valve flow test).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
阀门流量试验(Valve flow test)

阀门流量试验(Valve flow test) Test process Carried out a thorough and meticulous division of labor in the organization before doing the experiment, the test scheme of valve characteristics, we cooperate closely in Xinhua company lonkings, in the required conditions, respectively in May of the following loading (135130125120115110105100,95,92,89,86,83MW) to do the test, operation personnel responsible for the implementation of the test operation. (1) purpose of the test: 1) measuring the single valve under high pressure governing valve stroke h and flow (regulating pressure characteristics). 2) measuring multi valve under high pressure governing valve stroke h and flow (regulating pressure characteristics). Including GV1 (GV2, GV3, full closed GV4), GV1 (GV3, GV4, GV2 full closed), GV1-GV3 (GV4 off), GV1-GV4 full open condition. 3) according to the above measured valve stroke flow characteristics, optimize valve management, improve economic efficiency. Two) test preconditions: 1) the unit must maintain the rated main steam pressure. 2) the unit load can change between the rated parameter, the full load of the valve and the load range of 60MW. 3) the main measuring point transmitter and the measuring channel are qualified. 4) test procedures, commissioning, installation comply with test requirements (can remove valve overlap). Three) test methods: 1) steam condition adjustment is completed by boiler control system. 2) the valve running condition is completed by the DEH test program; DEH in the valve position control mode (MW, IMP loop removal), change the given value (ie valve position instructions) to achieve changes in the test conditions. 3) the pressure, the given value, the flow rate, the valve position, the power and so on, are collected by DEH, and the flow is replaced by the pressure of the regulating stage. 4) the management curve uses no overlap curve. 5) DEH by a given valve position adjustment, boiler pressure stability, DEH data acquisition, the main steam pres

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档