防护员考试复习题(Examination questions for guard).doc

防护员考试复习题(Examination questions for guard).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
防护员考试复习题(Examination questions for guard)

防护员考试复习题(Examination questions for guard) 1, the guard must be assigned the railway system training, after passing the examination, the official staff and have the certificate and certificate. 2, the guard should be a strong sense of responsibility, master production skills, the railway training examination to obtain the certificate as a road. In 3, the guard posts, must wear protective equipment required to wear a badge, certificate according to the provisions of articles bring protection signal. 4. The guard must be full of spirit when he is on duty. Please take full rest before going to work. No drinks should be allowed before class or in class. In case of reaction, stop the work immediately. 5, the guard in their respective posts, earnestly implement the operation standards, reflects the post responsibility. The link of the post responsibility between the guards forms our construction protection system. 6, find the train approaching, notify the operating personnel avoiding car sound for a long. The registration time of the 7 and 2nd class construction shall be 1 hours before the blocking point. 8, in the daytime fog, resulting in the deceleration signal display distance is less than 400m, should use the night signal. 9, Shanghai Kunming line, Beijing Kowloon Line blocked section construction work, more than 180 minutes as the two construction. 10, comprehensive maintenance sunroof once approved, if encountered special circumstances, may not apply for execution. 11. The main body of the construction protection system consists of the construction supervisor, the site guard, the end guard and the station guard. 12, in order to ensure the safety of the operation line, the construction should follow the principle of no construction, no driving, no construction. 13, construction window blocking operation, guard should not less than 4 people. 14, in accordance with the nature and content of construction, construction is divided into five categories, that is, blockade,

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档