地铁盾构施工工法专业技术(Professional technology of metro shield construction method).doc

地铁盾构施工工法专业技术(Professional technology of metro shield construction method).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁盾构施工工法专业技术(Professional technology of metro shield construction method)

地铁盾构施工工法专业技术(Professional technology of metro shield construction method) Metro shield construction method of professional technology 2009-10-22 12:58:06 reading 126 review 2: big and small Construction method of EPB shield tunneling method 1, characteristics 1.1 shield construction is a multi procedure procedure, with high automation, fast construction, good quality and high safety. 1.2 shield tunneling without precipitation auxiliary construction, and segments are factory prefabricated, conducive to environmental protection and reduce construction interference to the normal order of urban life. 1.3, by establishing and maintaining the dynamic balance between the earth pressure and the water pressure of the excavation surface in the sealed storehouse, the disturbance of the construction to the soil layer is reduced, the working surface is stable, and the surface depression can be effectively controlled. 1.4 compared with the slurry shield method, the required site area is small and the construction cost is low. 2, process principle The working principle of earth pressure balance shield machine is with the advance of shield, soil cutter cutting down into the sealing chamber, the parts of the soil to maintain appropriate pressure inside the warehouse, balancing and water pressure of excavation face. At the same time, through the control of the screw conveyor and the soil dumping valve, the matching of the amount of discharge and the amount of thrust of the shield will be realized, and the dynamic balance of the shield while maintaining the stability of the excavation face will be formed. 3, application examples Beijing metro line four North Station to Beijing South Railway Station interval project, as part of the Beijing Metro Line four. The entire project from the southern city of Victoria Majialou, along the north end Longbei to the village, the line length of 28.14km, a total of 24 stations. The north station to Beijing South Railway Station interval shield tunnel

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档