- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
油库油罐区管线改造管线方案(Pipeline scheme for pipeline reconstruction in oil tank farm)
油库油罐区管线改造管线方案(Pipeline scheme for pipeline reconstruction in oil tank farm)
Oil tank area pipeline reconstruction pipeline project.Txt two people quarrel, the first to say sorry to the people, not to admit defeat, and not forgive. He only cares more about the relationship than the other. This article by baby, baby, I love to contribute
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Revamping plan of pipeline project in tank farm, revamping plan of pipeline project in tank farm, tank farm project
For gasoline, diesel oil, diesel oil pipeline construction industry needs of existing in the tank within the pipeline cutting and welding process, to ensure the construction quality of oil depot, formulated as follows: pipeline and pipeline reconstruction scheme, a major transformation of the region will start with 101, line 102 tanks and 103, 104 tank, added in the middle of the 1 DN150 valve, the valve closed to achieve two kinds of oil each start function, realize the reladling each tank valve opening, will start the 103 existing gasoline pipeline, No. 104, No. 90 gasoline tank to collect oil lines, (II) in the old vehicle on line opening barge receiving oil branches 2, the original oil pipeline as the No. 0 diesel oil pipeline, this tank can be realized without adding new pipeline No. 0 diesel and 90 petrol (II) independent of oil collection and Departure function. Since the No. 108 tank has been transferred from the transit pump station to the wharf, a new DN150 oil receiving pipeline has been added and connected with tanks 108, 109 and 110. Two, pipeline reconstruction process, pipeline reconstruction process transformation
1. before the construction work for (a) to confirm whether to fire pipeline conditions. 1) cleaning the pipeline with chemicals. 2) after cleaning, must use the explosion detector test to fire conditions.
(two) around the pipeline safety measures
您可能关注的文档
- 部分网站打不开如何处理文本文档(Some web sites are unable to handle text documents).doc
- 部分网站打不开如何处理(Part of the site can not open, how to deal with).doc
- 部分网站打不开如何处理(Some sites can not be opened, how to deal with).doc
- 部分网站打不开(Part of the site can not open).doc
- 郭德纲相声(Guo Degang crosstalk).doc
- 郭德纲经典相声合集(Guo Degang classics cross talk collection).doc
- 都匀市公交公司房屋质量问题(Quality problems of Tuyun bus company housing).doc
- 都市快餐店项目设计书(City fast-food restaurant project design).doc
- 配位化学的进展(Progress in coordination chemistry).doc
- 鄞州区行政服务中心文明单位创建工作总结(Summary of the establishment of civilized units in Yinzhou District administrative service center).doc
文档评论(0)