浅谈清单计价下装饰企业材料成本控制的途径().doc

浅谈清单计价下装饰企业材料成本控制的途径().doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈清单计价下装饰企业材料成本控制的途径()

浅谈清单计价下装饰企业材料成本控制的途径() The implementation of the bill of quantities is to give full play to the role of market mechanism, perfect project cost formation mechanism, an important measure to deepen the reform of the construction cost, is a fundamental measure to standardize the construction market economic order, with the implementation of standards bill of quantities, the construction market to bring greater vitality. The total cost of the project under the list valuation consists of list items, fees, measures, project fees, other project fees, fees and taxes, while the list items include labor, materials, machinery, management fees and profits. Through the analysis of each part of the project cost under the bill, decoration industry, material costs accounted for the total cost of the project in 70-85%, new curtain wall engineering materials even accounted for the total cost of the project 80-90%. Therefore, the control of material cost is the key to the cost control of Engineering projects. Therefore, if the material costs are well controlled, it will inevitably reduce the cost of the project and improve the market competitiveness of its products. Now the list pricing under the decoration enterprise material cost control way of several experience after, for reference to the relevant personnel. First, material cost control in design phase: Because of the decoration engineering bidding and often design related, especially the exterior curtain wall engineering, the design level of the project directly influence a customer, but also related to the decoration enterprise process and installation cost level. Therefore, design is the source of cost control and cost reduction for decoration enterprises. Such material cost control measures can usually be taken. 1, design plan review. After receiving the project design task, the design department will arrange the design team to formulate the design plan, organize the plan review meeting, optimize the design plan, and create the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档