- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
点家居装修经验谈(Experience of home decoration)
点家居装修经验谈(Experience of home decoration)
1, shoes partition not to do the head, leave a little space, so that shoes ash can leak to the bottom, tanks and gas burner above the lamp. When deciding the location of the floor drain in the bathroom, you must first think about it and measure the size. The floor drain is best located on the side of the brick. If it is in the middle of the brick, no matter how the brick is tilted, the floor drain will not be the lowest point.
2, bathrooms, air conditioning sockets are not designed switches. In particular, the bathroom electric water heater, with a two stage switch with one plug is appropriate. If you want to turn off the electric heating, it is dangerous to pull out the plug
3, on the tile Yang Kok part of the treatment, in the final analysis is to look at the level of workers. If the level of the wet workers is good, and the tools for grinding tiles are better, the method of grinding 45 degrees angle should be chosen without hesitation. From the point of view of the effect, as long as the good grinding, grinding 45 degrees angle Yang Kok approach is the most beautiful! If the level of workers is really not good, then you still choose to use Yang Kok bar, because the poor grinding of 45 degrees angle, it is better to use the effect of Yang kok.
4. It is also important to test the pressure of the water pipe after draining the pipe. When testing, we must be present, and the test time is at least 30 minutes or more, conditional license, preferably one hour. 10 kg compression, and finally there is no reduction to pass the test.
5, steel doors must be considered steel door protruding wall dimensions, notify the installation personnel, which makes the final frame and end paste porcelain wall is flat, it is beautiful, and good health.
6, wood package door and Masons tiles is to match the time, packet door, to consider the ground below (either side of the ground on both sides of the door) is also ceramic tile or other cement mortar t
您可能关注的文档
- 阿甘正传的秘密(The secret of Agam).doc
- 陈瓘全集(The complete works of Chen Ji).doc
- 防雷工程(Lightning protection engineering).doc
- 鸡肋市场,售后效益最大化四步曲(Chicken ribs market, after-sales service to maximize the four steps song).doc
- 地铁时代将为沈阳带来生活、消费方式巨变(Subway age will bring about great changes in lifestyle and consumption for Shenyang).doc
- 地铁盾构施工工法专业技术(Professional technology of metro shield construction method).doc
- 黑天鹅式生存(Black swan survival).doc
- 地面清洁保养应注意的问题(Ground cleaning and maintenance should pay attention to the problem).doc
- 地面环氧树脂(Ground epoxy resin).doc
- 陈列提升平效(Display promotion leveling effect).doc
文档评论(0)