- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电梯安装工程监理细则(Rules for supervision of elevator installation works)
电梯安装工程监理细则(Rules for supervision of elevator installation works)
* supervision of elevator installation works
These rules are applicable to the supervision and management of the installation and acceptance of all kinds of domestic and imported traction drive elevators under rated load 5000kg and less than the rated speed 3m/s.
First, rail installation works
1 procedures and requirements
(1) the installation unit for the use of steel and other materials should fill in building materials (installation) report form, to be signed by the engineer certification after return.
(2) elevator drawings, technical documents, factory certificate, manual complete, and technical personnel construction technical disclosure record.
(3) the installation unit will work together with the supervision engineer to pack the equipment according to the packing list,
The host equipment, car, elevator hall door, rail, counterweight, electrical control cabinet, excitation cabinet, limit switches and other components to check out of the box, check the quantity, quality, whether there is damage, record and sign.
(4) the guide rails and the guide rail bracket, pressure plate, said plate and a guide rail base and corresponding connecting screws and other specifications quantity and packing list.
(5) the scaffold of the hoistway must be checked and accepted by the safety technical department before acceptance, and the power consumption of the field and the lighting shall be in line with the requirements of the technical specification for temporary power consumption on the construction site.
2 construction stage operation process
(1) rail installation process flow:
(2) re installation process:
3 monitoring key points and quality standards
(1) quality standards, the implementation of elevator installation project quality inspection and evaluation standards in the second chapter.
(2) the main points of supervision are shown in the following table:
Control points of installation content supervision
Guide
您可能关注的文档
- 清理电脑垃圾文件(Clean your computer garbage files).doc
- 清美各专业导师和资料(The professional instructors and beauty).doc
- 温州德纳展览公司温州国际皮革展买家相关的康帕斯产品服务分类(Wenzhou Donnor exhibition company of Wenzhou International Leather Fair buyers related Kompass product service classification).doc
- 渡边淳一(Junichi Watanabe).doc
- 温中法临证运用心得(Experience of using Chinese and French syndromes).doc
- 清代中晚期的土尔扈特部落 第一节 设置盟旗(In the late Qing Dynasty the Turehot tribe first set the flag).doc
- 清代名人趣史(清朝佚名)(The Qing Dynasty famous interest history (Qing Dynasty.)).doc
- 温暖,就这么简单(Warm, it's so simple).doc
- 游戏开发基础(Game development Fundamentals).doc
- 游戏真心话大全(Game words).doc
- 北师大版小学数学三年级上册《寄书》教学设计.docx
- 统编版(部编版)语文二年级上册《雪孩子》教学设计.docx
- 统编版(部编版)语文二年级上册《八角楼上》教学设计.docx
- 北师大版小学数学三年级上册《长方形周长》教学设计.docx
- 北师大版小学数学三年级上册《丰收了》教学设计.docx
- 统编版(部编版)语文二年级上册《夜宿山寺》教学设计.docx
- 统编版(部编版)语文二年级上册《风娃娃》教学设计.docx
- 统编版(部编版)语文二年级上册《朱德的扁担》教学设计.docx
- 统编版(部编版)语文二年级上册《难忘的泼水节》教学设计.docx
- 统编版(部编版)语文二年级上册《纸船和风筝》教学设计.docx
文档评论(0)