电气工程的施工方案及措施(Electrical engineering construction plan and measures).doc

电气工程的施工方案及措施(Electrical engineering construction plan and measures).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电气工程的施工方案及措施(Electrical engineering construction plan and measures)

电气工程的施工方案及措施(Electrical engineering construction plan and measures) Electrical engineering construction plan and measures 3.7 construction plan and measures of electrical engineering 3.7.1 Engineering Overview: the new tower of the capital airport is planned to be built at the north end of the new T3 terminal at the capital airport. It is located on the east side of the central line of the East runway, 905m, from the southern end of the East runway to the 2665m. Construction land area is 13334m2. Trapezoidal shape, flat terrain, the tower is round, the highest point of the new tower elevation 79.6m. The project construction area of 341.1m2, total construction area of 2647.0m2, on 1950.5m2, the indoor relative elevation of + 0 relative to the absolute elevation 30.60, height difference between indoor and outdoor 0.30m, Ming room floor relative elevation is 74.7m, air traffic controllers for the 75.6m line of sight. The basement of this project is a shelter for the air defense professional team. The protection level is 5, and the building fire resistance level is one. 3.7.2 scope: 3.7.2.1 this set of design drawings including the electrical system within the red line: (1) 10/0.4KV (2) distribution system; power distribution system; (3) lighting system; (4) building lightning protection, grounding system and safety measures; (5) the civil air defense engineering; 3.7.2.2 and other professional design division: This design only reserved position distribution box and indicate the power consumption of special equipment required for water supply and drainage professional places; the elevation of 9.662.1 layer pipeline electric heat tracing system, this design only reserved to the electric heating power control box. The electric heating control box and wiring are provided by the manufacturer. 3.7.2.310/0.4KV distribution system: (1) the load level and the capacity of the project: electrical equipment, processing equipment, lighting and other electrical light room is conside

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档