- 1、本文档共12页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电气工程的施工方案及措施(Electrical engineering construction plan and measures)
电气工程的施工方案及措施(Electrical engineering construction plan and measures)
Electrical engineering construction plan and measures
3.7 construction plan and measures of electrical engineering 3.7.1 Engineering Overview: the new tower of the capital airport is planned to be built at the north end of the new T3 terminal at the capital airport. It is located on the east side of the central line of the East runway, 905m, from the southern end of the East runway to the 2665m. Construction land area is 13334m2. Trapezoidal shape, flat terrain, the tower is round, the highest point of the new tower elevation 79.6m. The project construction area of 341.1m2, total construction area of 2647.0m2, on 1950.5m2, the indoor relative elevation of + 0 relative to the absolute elevation 30.60, height difference between indoor and outdoor 0.30m, Ming room floor relative elevation is 74.7m, air traffic controllers for the 75.6m line of sight. The basement of this project is a shelter for the air defense professional team. The protection level is 5, and the building fire resistance level is one. 3.7.2 scope: 3.7.2.1 this set of design drawings including the electrical system within the red line: (1) 10/0.4KV (2) distribution system; power distribution system; (3) lighting system; (4) building lightning protection, grounding system and safety measures; (5) the civil air defense engineering; 3.7.2.2 and other professional design division: This design only reserved position distribution box and indicate the power consumption of special equipment required for water supply and drainage professional places; the elevation of 9.662.1 layer pipeline electric heat tracing system, this design only reserved to the electric heating power control box. The electric heating control box and wiring are provided by the manufacturer. 3.7.2.310/0.4KV distribution system: (1) the load level and the capacity of the project: electrical equipment, processing equipment, lighting and other electrical light room is conside
您可能关注的文档
- 清美各专业导师和资料(The professional instructors and beauty).doc
- 温州德纳展览公司温州国际皮革展买家相关的康帕斯产品服务分类(Wenzhou Donnor exhibition company of Wenzhou International Leather Fair buyers related Kompass product service classification).doc
- 渡边淳一(Junichi Watanabe).doc
- 温中法临证运用心得(Experience of using Chinese and French syndromes).doc
- 清代中晚期的土尔扈特部落 第一节 设置盟旗(In the late Qing Dynasty the Turehot tribe first set the flag).doc
- 清代名人趣史(清朝佚名)(The Qing Dynasty famous interest history (Qing Dynasty.)).doc
- 温暖,就这么简单(Warm, it's so simple).doc
- 游戏开发基础(Game development Fundamentals).doc
- 游戏真心话大全(Game words).doc
- 清水砖墙勾缝施工工艺(9010-1996)(The plain brick wall construction technology (9010-1996)).doc
- 北师大版小学数学三年级上册《寄书》教学设计.docx
- 统编版(部编版)语文二年级上册《雪孩子》教学设计.docx
- 统编版(部编版)语文二年级上册《八角楼上》教学设计.docx
- 北师大版小学数学三年级上册《长方形周长》教学设计.docx
- 北师大版小学数学三年级上册《丰收了》教学设计.docx
- 统编版(部编版)语文二年级上册《夜宿山寺》教学设计.docx
- 统编版(部编版)语文二年级上册《风娃娃》教学设计.docx
- 统编版(部编版)语文二年级上册《朱德的扁担》教学设计.docx
- 统编版(部编版)语文二年级上册《难忘的泼水节》教学设计.docx
- 统编版(部编版)语文二年级上册《纸船和风筝》教学设计.docx
文档评论(0)