电路检测(Circuit detection)
电路检测(Circuit detection)
1. view, test
Check whether the original circuit has leakage protector, if any, press the test button in the energized state, check whether the leakage protector is reliable, and test other air switches to see whether it is flexible and normal.
2. shake
Take the master switch, shake the meter, measure the resistance of each line to the ground, and see the insulation resistance between the line and the line to see whether it is normal. Make sure the inspection is normal and fit in the case cover.
3 、 weak current testing
Detect television lines, telephone lines, network lines, etc..
4, the original room switch, socket testing
4.1 on the lighting circuit power, according to each room switch to see whether they are lit. If the distribution box has two or more than two lighting circuits, then determine each circuit clearly corresponding line.
4.2 remove the switch panel to see the size of the wire and whether the wires are separated.
4.3, check each socket whether power, wire diameter, wire color separation, single-phase socket is left, zero, right, fire grounding, three-phase socket is three phase one ground (zero).
5, provide relevant information
Require owners to provide the original strong and weak layout drawings, related circuits, electrical drawings and data, and ask whether the owners have purchased sufficient construction temporary electricity.
6 、 test relevant standards and requirements
6.1 wire and wire to ground resistance must be greater than 0.5M ohm.
6.2 of the original real wire diameter should meet the following requirements: lighting circuit with copper wire is over 1.5mm2, using socket loop of copper wire was 2.5mm2, copper wire was 4mm2 with air conditioning circuit.
The 6.3 level should be between 6080dB cable.
6.4, if the measured data does not meet the relevant standards and requirements, we must inform the owners, requiring property rectification, when the inspection fully meet the requirements before construction.
Four,
您可能关注的文档
- 焊接工艺代号(Welding process code).doc
- 焊接工艺1(Welding process 1).doc
- 焊接工艺手册(Welding process manual).doc
- 焊接工艺评定的基本要求(Basic requirements for welding procedure qualification).doc
- 焊接方法大全(Complete welding method).doc
- 焊接接头工艺设计(Welding process design).doc
- 焊接电路板技巧(Welding circuit board skills).doc
- 焊接质量控制(Welding quality control).doc
- 焊接的种类1(Types of welding 1).doc
- 焦作地暖材料——pe-rt管业规范化发展之路有多远(Jiaozuo ground heating material -- how far is the standardization development of PE-RT pipe industry).doc
文档评论(0)