空调设计顺序(Air conditioning design order).doc

空调设计顺序(Air conditioning design order).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
空调设计顺序(Air conditioning design order)

空调设计顺序(Air conditioning design order) Design order: first terminal, then host Design principles: reasonable, economical, maximum operating cost savings Design scheme and scope of application: I. end part: 1 、 fan coil system; Scope of application: General Office, catering and other places 2. Fan coil unit plus fresh air system; Scope of application: higher office, hotels, restaurants, entertainment and other places 3, all air system; Scope of application: large bays, such as shopping malls, supermarkets, workshops and so on Two, host part: 1, screw chiller, municipal or boiler heating; Scope of application: a dedicated computer room, adequate power, requiring special duty 2, air-cooled units (heating), municipal or boiler heating; Scope of application: air conditioning area is small, there is no room, no special duty 3, centrifugal chiller, municipal or boiler heating; Scope of application: air conditioning area is large, there are dedicated rooms, adequate power, requiring special duty 4, lithium bromide chiller (heating), municipal or boiler heating; Scope of application: power shortage, municipal heat source, and by comprehensive comparison of the economy, a dedicated computer room, the need for special duty Three, other: 1, one or more systems; Scope of application: air conditioning area is small, no special room, no one on duty, air conditioning area is larger, but not at the same time, and need to be independent billing and other places 2 、 pipe fan system; Scope of application: large bay, no dedicated computer room, no one on duty, flexible control, low initial investment Design procedure: I. end part: (1) equipment selection: 1. Calculate the actual air conditioning area; 2, according to the use of location to determine the cold load index, calculate the total design load, according to equipment layout characteristics determine the required equipment quantity, determine the equipment type; Cold load estimate index: Adopt combined air conditioner, cycle times

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档