空调设计顺序(Air conditioning design order)
空调设计顺序(Air conditioning design order)
Design order: first terminal, then host
Design principles: reasonable, economical, maximum operating cost savings
Design scheme and scope of application:
I. end part:
1 、 fan coil system;
Scope of application: General Office, catering and other places
2. Fan coil unit plus fresh air system;
Scope of application: higher office, hotels, restaurants, entertainment and other places
3, all air system;
Scope of application: large bays, such as shopping malls, supermarkets, workshops and so on
Two, host part:
1, screw chiller, municipal or boiler heating;
Scope of application: a dedicated computer room, adequate power, requiring special duty
2, air-cooled units (heating), municipal or boiler heating;
Scope of application: air conditioning area is small, there is no room, no special duty
3, centrifugal chiller, municipal or boiler heating;
Scope of application: air conditioning area is large, there are dedicated rooms, adequate power, requiring special duty
4, lithium bromide chiller (heating), municipal or boiler heating;
Scope of application: power shortage, municipal heat source, and by comprehensive comparison of the economy, a dedicated computer room, the need for special duty
Three, other:
1, one or more systems;
Scope of application: air conditioning area is small, no special room, no one on duty, air conditioning area is larger, but not at the same time, and need to be independent billing and other places
2 、 pipe fan system;
Scope of application: large bay, no dedicated computer room, no one on duty, flexible control, low initial investment
Design procedure:
I. end part:
(1) equipment selection:
1. Calculate the actual air conditioning area;
2, according to the use of location to determine the cold load index, calculate the total design load, according to equipment layout characteristics determine the required equipment quantity, determine the equipment type;
Cold load estimate index:
Adopt combined air conditioner, cycle times
您可能关注的文档
- 电梯短接线号总结(Summary of elevator short connection number).doc
- 电站锅炉结构(Utility boiler structure).doc
- 电网题(Power grid problem).doc
- 电脑上不了网只能上q解决办法(Computer can not network, only on the Q solution).doc
- 电脑上不了网问题总结(Computer not net problem summary).doc
- 电脑使用快捷键(The computer uses a shortcut key).doc
- 电脑不能上网的原因以及解决方法(Reasons why computers can not access the Internet and Solutions).doc
- 电脑变得反应很慢(The computer becomes very reactive).doc
- 电脑图a(Computer graphics a).doc
- 电脑开机各种滴声引起的电脑故障解析大全(Computer startup various drip sound caused by computer fault analysis Daquan).doc
- 2023-2024学年广东省深圳市龙岗区高二(上)期末物理试卷(含答案).pdf
- 2023-2024学年贵州省贵阳市普通中学高一(下)期末物理试卷(含答案).pdf
- 21.《大自然的声音》课件(共45张PPT).pptx
- 2023年江西省吉安市吉安县小升初数学试卷(含答案).pdf
- 2024-2025学年广东省清远市九校联考高一(上)期中物理试卷(含答案).pdf
- 广东省珠海市六校联考2024-2025学年高二上学期11月期中考试语文试题.pdf
- 2024-2025学年语文六年级上册第4单元-单元素养测试(含答案).pdf
- 2024-2025学年重庆八中高三(上)月考物理试卷(10月份)(含答案).pdf
- 安徽省安庆市潜山市北片学校联考2024-2025学年七年级上学期期中生物学试题(含答案).pdf
- 贵州省部分校2024-2025学年九年级上学期期中联考数学试题(含答案).pdf
文档评论(0)