综合布线系统要点(Main points of generic cabling system).doc

综合布线系统要点(Main points of generic cabling system).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
综合布线系统要点(Main points of generic cabling system)

综合布线系统要点(Main points of generic cabling system) The design of the bridge is reasonable, so as to ensure the proper bending radius of the cable. When the upper and lower sides are around the other line grooves, the slope of the turn should be gentle, and the key point is that the cable at both ends will sag. After the force is applied, the cover plate can also be laid on the premise that the cable is not damaged. On line process is mainly control the tension, the tape reel cable, at least two suggestions to arrange for a worker to scroll in Guyed pole homemade, line end workers first pulled out a part of the cable from the scroll box for the pipeline in the pre, the other end of pre extraction. Pull out of the line can not be too much, to avoid entanglement with a plurality of lines on the ground around. Stay after the operation, both sides of the cable for redundancy to collate and protect the disk line along the direction of rotation of the original coil diameter, not too small, if possible with waste thread fixed on the tray, ceiling or cartons, do mark, to remind other personnel do not move, do not step on. In the finishing, binding, cable placement, redundant cable should not be too long, do not let the cable stress superposition, coil with consolidation, fixed rope not looking too tight. Throughout the construction process, timely notification of the process, the person in charge of various types of work to communicate, to identify problems immediately notify Party A, in other follow-up work before the start of the timely completion of the task of this type of work. If the installation is unshielded twisted pair, the docking site is not high enough to be earthed at the main slot connected to the cabinet. The specification of the slot is to confirm that the cross section of the slot remains 40% of the surplus to be expanded, and the cross section area of the over 5 types of twisted pair is 0.3 square centimeters. When installing the slot, attention should be pai

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档