- 1、本文档共32页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SAPPS模块详细介绍幻灯片
是一个在企业范围内的集成的系统 实时的事件处理方式 能够提交实时的项目报告 可以使用积极的项目管理方式 可以使用工作流 横跨整个企业的完整的资源管理方案 融入了项目管理的整个生命周期 可以处理多种币种 能够在多个层次上使用多种控制方式 R/3 项目管理系统 * * After the material is selected the delivery note is created with reference to the network component. If a delivery note (document type LP) is created from a project, every delivery item (item category DLP) has a direct reference to a reservation or purchase requisition in the network. This is used for account assignment of costs, availability checks, updating the goods issue and issue quantity. * * In Release 4.0 there is one screen for assigning LO work centers to HR You can assign LO work centers to HR work centers.In this case you can assign persons or jobs directly in the LO work center. The assignments are updated automatically in the HR work center.There is no check, if the cost centers of the LO and HR work center are identical Alternatively you can assign LO work centers to HR organizational units. In this case, assignments to persons, are created within HR and cannot be changed within the LO work center. * A CO Plan Version saves planned costs or revenues of projects from the operative version 0 to versions 1, 2, .... In Release 4.0 you can save the calculated costs of networks and other assigned appended orders into CO plan versions * Procedure: You can save operative functions as versions (sub-trees too) - or -at first create projects as a version without an operarative project and change (quotation phase). You can simulataneously have several parallel versions for one project. Transfer a simualtion version to an operative project (for example, award of contract). ‘Post-planning of an operative project with alternative versionsTransfer the changes to the operative version You can transfer the data in a test run before executing. During tranfer an error log is writtewn and saved. Errors have to be corrected. The log records which version abd which objects have been transfered. * The total budget of one position
您可能关注的文档
- JGJ130-2011《建筑施工扣件式钢管脚手架安全技术规范》讲义幻灯片.pptx
- JTGE20-2011公路工程沥青及沥青混合料试验规程(修订主要内容)_PPT幻灯片.ppt
- JX1010角钢线定位问题答疑幻灯片.ppt
- KETTLE使用说明(中文版)幻灯片.ppt
- KA运作模式PPT幻灯片.ppt
- IPSTAR设备安装培训幻灯片.ppt
- jt四年级上册《语文园地七》完整版幻灯片.ppt
- K线技术大全(49个定式信号)幻灯片.ppt
- KLSeis简单介绍幻灯片.ppt
- jiang林黛玉进贾府幻灯片.ppt
- 2025届四川省成都外国语高级中学高考语文试题命题比赛模拟试卷(28)含解析.doc
- 2025届四川省内江市高中高三下第一次月考语文试题含解析.doc
- 2025届四川省双流艺体中学下学期高三语文试题5月联考考试试卷含解析.doc
- 2025届太和二中高三下学期适应性月考(一)语文试题含解析.doc
- 2025届四川省宜宾县白花中学高三3月综合素养调研语文试题理试题含解析.doc
- 2024年四年级语文教学计划范本(三篇) .pdf
- 2024年幼儿园教师节活动方案七篇 .pdf
- 2024年山东省济南市普通高校对口单招语文模拟试卷(答案) .pdf
- 2024年实验室工作计划(六篇) .pdf
- 2024年图书馆管理员工作总结(7篇) .pdf
文档评论(0)