SAPPS模块详细介绍幻灯片.ppt

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SAPPS模块详细介绍幻灯片

是一个在企业范围内的集成的系统 实时的事件处理方式 能够提交实时的项目报告 可以使用积极的项目管理方式 可以使用工作流 横跨整个企业的完整的资源管理方案 融入了项目管理的整个生命周期 可以处理多种币种 能够在多个层次上使用多种控制方式 R/3 项目管理系统 * * After the material is selected the delivery note is created with reference to the network component. If a delivery note (document type LP) is created from a project, every delivery item (item category DLP) has a direct reference to a reservation or purchase requisition in the network. This is used for account assignment of costs, availability checks, updating the goods issue and issue quantity. * * In Release 4.0 there is one screen for assigning LO work centers to HR You can assign LO work centers to HR work centers. In this case you can assign persons or jobs directly in the LO work center. The assignments are updated automatically in the HR work center. There is no check, if the cost centers of the LO and HR work center are identical Alternatively you can assign LO work centers to HR organizational units. In this case, assignments to persons, are created within HR and cannot be changed within the LO work center. * A CO Plan Version saves planned costs or revenues of projects from the operative version 0 to versions 1, 2, .... In Release 4.0 you can save the calculated costs of networks and other assigned appended orders into CO plan versions * Procedure: You can save operative functions as versions (sub-trees too) - or - at first create projects as a version without an operarative project and change (quotation phase). You can simulataneously have several parallel versions for one project. Transfer a simualtion version to an operative project (for example, award of contract). ‘Post-planning of an operative project with alternative versions Transfer the changes to the operative version You can transfer the data in a test run before executing. During tranfer an error log is writtewn and saved. Errors have to be corrected. The log records which version abd which objects have been transfered. * The total budget of one position

文档评论(0)

wnqwwy20 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档