- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新停送电管理办法(Measures for the administration of new power transmission and shutdown)
新停送电管理办法(Measures for the administration of new power transmission and shutdown)
Chapter I General Provisions
Article 1: to ensure that equipment maintenance, maintenance, operation, clearance clearance personal and equipment safety, standard stop transmission procedures are formulated.
Article second: instrument industry and other works of repair or maintenance operations are the application of this approach.
The second chapter management regulations
Third: the site of any charged equipment repair or maintenance work, as well as by the effect of the system equipment operation equipment such as kiln, grinding, electric dust, large fan and other equipment in pipeline internal inspection or maintenance work, must go to stop transmission procedures, namely before operation for stopping power procedures, the completion of the application operation transmission procedures, must strictly abide by the pen stop transmission principle.
Fourth: stop transmission a pen principle: the power transmission applicant, the applicant is a person; power transmission approval, approval person is a person, and approval in principle is specified by branch outage for approval, the applicant, and the operation can not be the same person, stop transmission operation strictly according to the operation order execution.
Fifth: as relates to the two continuous on the same project maintenance, to project handover, the original power will transfer to the applicant operation ticket in succession maintenance charge, and endorsement, the section leadership, leadership after the approval of the effective branch double sign (only allowed a handover, maintenance) after the successor to carry operation ticket for power transmission. If the operation ticket is lost, the application made by the section leader, signed by the principal leaders of the factory after confirmation, can send electricity.
Sixth: the same equipment must be handled independently to stop transmission procedures several maintenance
文档评论(0)