- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内铸铁排水管道安装(Installation of cast iron drainage pipes for indoor use)
室内铸铁排水管道安装(Installation of cast iron drainage pipes for indoor use)
The cast iron drainage pipe installation
Release date: 2011-12-06 09:29:24
1. material requirements
1.1 cast iron pipes and pipe fittings specifications should comply with the design requirements. The wall thickness of cast iron is uniform and smooth, clean, no
Floating sand, sand, sand, but does not allow the blisters, cracks, fly and bumps perversing. Inside and outside the socket pipe diameter and other rules, flat flange interface
Is smooth and tight, drain water returning bending buckling distance must be consistent, not biased buckle, buckle, buckle, buckle out other phenomena.
1.2 galvanized carbon steel pipe and pipe fittings galvanized inside and outside wall of uniform, no rust, no fly wall puncture, tube partial buckle, buckle, buckle, disorderly threads can not
The whole, are not allowed to view the phenomenon.
1.3, Yau Ma velvetleaf to be neat, a decadent phenomenon is not allowed. Asphalt paint, antirust paint, paint and powder must have factory certification.
1.4 cement with 325 cement, must have a certificate or certificate examination.
1.5 other materials: gasoline, oil, rubber cloth, electric welding rod, steel wire, bolts and nuts, etc..
2. main equipments
2.1 sets of equipment: wire machine, welding machine, bench drill, impact drill, electric hammer, grinding machine etc..
2.2 sets of tools: wire plate, hammer, hammer, hand saw, broken tube, chisel, twist drill chisel, hemp, pressure case, table vice, clamp, car etc..
2.3 others: the level of scale, line sinkers, steel tape, small line etc..
3. operating conditions
3.1 underground drainage pipeline laying must be based on a wall at or near the elevation of + 0 to the bottom of the tube, the real soil backfill or slightly high,
The real heart along the pipeline location no deposit, and the pipeline through the building foundation, has according to the design requirements for good pipe hole.
The 3.2 layer drainage pipeline laying
您可能关注的文档
- 新形势下我国农村社会保障存在的问题及其对策(Problems and Countermeasures of rural social security in China under the new situation).doc
- 新手100条心得 英雄联盟排位大神推荐(Novice 100 experience hero league ranking great God recommended).doc
- 新心得体会(New experience).doc
- 新所得税准则资产负债表债务法探析(New income tax standard, balance sheet, debt law).doc
- 新房装修注意事项100招(100 attention to new home decoration).doc
- 新惯用语精编及详解(共收集112个)(New idioms for fine and detailed (total of 112)).doc
- 新手自学c语言提高效率的方法(Novice self taught C language to improve efficiency).doc
- 新技术角度下的木模板施工工艺探讨(Discussion on construction technology of wooden formwork under new technology).doc
- 新浪博客备份.如何备份新浪博客博客备份工具blogdown使用手记(Sina blog backup. How to backup Sina blog blog backup blogdown notes).doc
- 新浪网的介绍(Introduction to Sina).doc
文档评论(0)