市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures).doc
- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures)
市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures)
Related measures, engineering quality control
The quality control of 1. construction materials
Many municipal sewer problems more than in the pipe quality, some pipes originally crack, impermeability of compression capacity is weak and other issues, the project after the completion of easy water leakage. To ensure the quality of the project, should choose the regular manufacturers of pipe into the pipe before construction, construction site must sampling, inspection report of mechanical test tubes and strict verification certificate data, check the pipe appearance, found peeling, breakage, crack, honeycomb, explicit phenomenon shall put into use, to ensure the quality of pipe.
Quality control of stage 2. trench excavation
Should the production safety and engineering quality is determined considering the excavation section, the bottom of the tank, the tank bottom width, excavation depth, slope and other factors as the main basis for determining the slotted section, to ensure scientific and reasonable slotting; both scientific and economic slope sloping roadbed, ensure smooth and safe construction; if the construction site not affect the slope or the slope does not meet the requirements for the construction safety, we need to do pit supporting. In the process of excavation, with excavator surface broken asphalt layer and subgrade slag layer, excavated after a certain distance, to be on the bottom elevation measurement strictly control, special attention is not the top super trench bottom, if overbreak should be carefully backfilling, avoid the use of tamping rubbish and silt soil, humus inconsistent standards the soil at the bottom, eliminate low injection appeared the phenomenon of water intake.
3. level quality control in the construction of base seat
Trench excavation acceptance, can according to the design drawings on the tube base to start construction.
您可能关注的文档
- 五矿董事长讲话(Chairman of Minmetals speech).doc
- 事业编考试常识大全(七)_之阳_新浪博客(Addendum examination knowledge Daquan (seven) _ Yang _ Sina blog).doc
- 五种全面质量管理思路(Five general quality management ideas).doc
- 五年级班主任工作经验交流材料(Five grade teacher in charge of work experience exchange materials).doc
- 五菱鸿途(Wuling passers hung).doc
- 五险一金缴费比例排行 北京最高(Five social insurance and one housing fund contribution rate ranked highest in Beijing).doc
- 仙剑三-问情篇音乐鉴赏(Legend of three - piece of music appreciation course).doc
- 仙4天河经典台词(Fairy 4 Tianhe classic lines).doc
- 仙剑客栈——地图(Immortal sword inn map).doc
- 仙剑1物品属性及秘籍(Immortal sword 1 items attributes and Cheats).doc
- 专题01动物的主要类群(综合题20道).docx
- 中考辅导物理复习注意公式总结归纳.pptx
- 第三单元中国特色社会主义道路(期中期末真题重组卷)(原卷版).docx
- 2020-2021学年八年级历史上学期期中测试卷02(考试版).docx
- 上海城市基层党建高质量发展的创新经验.pptx
- 专题09记叙文阅读(原卷版)-2022年中考语文二模试题分类汇编(江苏).docx
- Unit6Task教案牛津译林版英语八年级下册.docx
- Unit4ExploringLiterature重点词汇语法导学案-高一英语牛津译林版(2020).docx
- 专题十四数字经济(命题预测)-2023年中考三轮时政热点主观题集训.docx
- 第08课列夫托尔斯泰-2022-2023学年八年级语文上册课后培优分级练(原卷版).docx
最近下载
- 期末测试卷(试题)-2024-2025学年人教PEP版(2024)英语三年级上册.docx VIP
- 高二年级第一次月考质量分析化学.doc VIP
- 人教部编版小学语文三年级上册期中质量检测试题(答案+评分标准).pdf VIP
- 小红书2023“家生活”趋势白皮书-青年志&安娜&奥维云网-2023-64页.pdf
- 小学生主题班会 垃圾分类(课件).pptx
- 江西省南昌市八年级上学期期中数学试卷附参考答案.pdf VIP
- QC∕T 948-2013 汽车顶部装载装置.pdf
- 2024年浙江事业单位招聘-宁波慈溪市机关事业单位编外招5人考试备考题库及答案解析.docx VIP
- 风险评估及控制管理流程 2023年ISO15189医学实验室管理体系.docx VIP
- 滴灌在园林绿化中的应用及前景.doc VIP
文档评论(0)