市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures).doc

市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures)

市政排水管道安全文明生产环保措施(Municipal drainage pipeline; safety; civilized production; environmental protection measures) Related measures, engineering quality control The quality control of 1. construction materials Many municipal sewer problems more than in the pipe quality, some pipes originally crack, impermeability of compression capacity is weak and other issues, the project after the completion of easy water leakage. To ensure the quality of the project, should choose the regular manufacturers of pipe into the pipe before construction, construction site must sampling, inspection report of mechanical test tubes and strict verification certificate data, check the pipe appearance, found peeling, breakage, crack, honeycomb, explicit phenomenon shall put into use, to ensure the quality of pipe. Quality control of stage 2. trench excavation Should the production safety and engineering quality is determined considering the excavation section, the bottom of the tank, the tank bottom width, excavation depth, slope and other factors as the main basis for determining the slotted section, to ensure scientific and reasonable slotting; both scientific and economic slope sloping roadbed, ensure smooth and safe construction; if the construction site not affect the slope or the slope does not meet the requirements for the construction safety, we need to do pit supporting. In the process of excavation, with excavator surface broken asphalt layer and subgrade slag layer, excavated after a certain distance, to be on the bottom elevation measurement strictly control, special attention is not the top super trench bottom, if overbreak should be carefully backfilling, avoid the use of tamping rubbish and silt soil, humus inconsistent standards the soil at the bottom, eliminate low injection appeared the phenomenon of water intake. 3. level quality control in the construction of base seat Trench excavation acceptance, can according to the design drawings on the tube base to start construction.

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档