- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
动设备方案(英文版)分析
SAUDI KAYAN PETROCHEMICAL CO., LTD.
SAUDI KAYAN PETROCHEMICAL COMPLEX U O PROJECT FLARE AREA
DOCUMENT TITLE:
METHOD STATEMENT FOR
INSTALLATION of ROTATING EQUIPMENT
SCC DOCUMENT NO: 063-QP-2-1003
Owner : Saudi Kayan Petrochemical Al-Jubal Saudi Arabia
PMC : FLOUR CO. LTD.
CONTENTS
1.0 Scope 3
2.0 REFERENCES 3
3.0 GENERAL 4
4.0 PROCEDURE 4
5.0 Project HSE Plan 11
6.0 Attachments 11
Scope
The procedure is aimed to describe the rotating equipment, like pump, compressor, etc in Saudi Kayan UO Project.
The installation should strictly follow all the applicable specification, standard, procedure (including HSE Plan), drawing and installation manual from vendor. If there is any conflict between this procedure and drawing requirement for the special requirement from equipment specification, the latter shall govern. At the same time, the procedure shall conform to the requirement from FLOUR CO.LTD.
REFERENCES
2.1 API 610
2.2 API 686
2.3 Plot plan
2.4 Installation manual
In which the installation procedures and allowable alignment tolerance can be found and referenced.
2.5 Vendor dwg
Drawings provided by the vendor and from which detailed fabrication drawings, assembly drawings, and sectional drawings can be found in order to ensure the mechanical assembly can be performed correctly
2.6 Piping arrangement dwg
From the drawings, the orientation and elevation of the equipment can be found.
2.7 Packing list
From which the quantity of each equipment part to be packed and more accurate weight can be found.
GENERAL
3.1 The inspection work comply with relevant project specifications,drawings,manufacturer’s documents and applicable codes or local regulations.
3.2 Manufacture’s documents ,drawings and installation instructions will be used as a part of this procedure.
3.3 Equipment to be assembled at site,such as large pump will be installed in accordance with the installation instruction suppl
您可能关注的文档
- 动力变质岩分析.ppt
- 动物成语大全分析.doc
- 动物世界——马分析.pptx
- 动物保护法中的实验动物分析.ppt
- 动物生物学(鸟纲)分析.ppt
- 动物的影子分析.ppt
- 动物医学腹部手术分析.ppt
- 动物营养学第十一章动物的维持需要分析.ppt
- 动画剧本创作分析.ppt
- 动画电影视听语言分析.ppt
- 时尚零售行业快时尚模式下的品牌形象重塑与品牌价值提升策略报告.docx
- AI驱动的个性化医疗方案报告:2025年市场前景与挑战.docx
- 数字化展示与传播策略研究:2025年文化遗产数字化展示与传播创新模式研究进展报告.docx
- 航空航天制造2025年材料科学在航空器安全性保障中的应用报告.docx
- 航空航天制造2025年材料科学在航空器抗撕裂性材料中的应用报告.docx
- 航空航天制造2025年材料科学在航空器复合材料结构设计中的应用报告.docx
- 互联网广告精准投放算法2025年效果评估与效果优化策略评估.docx
- 正式离职证明与劳动解除合同(8篇).docx
- 城区排水管网改造建设项目财务管理方案.docx
- 京东物流供应链效率在2025年的创新实践分析报告.docx
文档评论(0)