网站大量收购独家精品文档,联系QQ:2885784924

106散热器安装施工工艺(106 radiator installation construction process).doc

106散热器安装施工工艺(106 radiator installation construction process).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
106散热器安装施工工艺(106 radiator installation construction process)

106散热器安装施工工艺(106 radiator installation construction process) 1 range This technology is applicable to gray cast iron wing type, round airfoil, column type and M132 type of radiator and installation, steel flat tube type, plate type, column type and series radiator installation engineering. 2 construction preparation 2.1 material requirements: 2.1.1 radiator (iron and steel): radiator models, specifications, the use of pressure must meet the design requirements, and factory certification; radiator shall not have trachoma, mouth mouth, uneven surface, partial cracks and top center distance inconsistencies. The wing fins are intact. The fins of the steel string shall not be loose, curled or damaged. Steel radiator should be beautiful, straight thread, elastic fit, paint intact, whole furnace Alice corrugated sheet. 2.1.2 group of radiator parts: wire, furnace, furnace wall bushing, thread round wing flange, elbow, elbow, short bow wire, three links, elbow, oil, bolts and nuts shall comply with the quality requirements, unbiased buckle, buckle, floss and breaking buckle. Straight thread, elastic fit. The asbestos rubber pad should be 1mm thick (no more than 1.5mm thick) and meet the pressure requirement. 2.1.3 other materials: steel, brace pad, a supporting hook, a fixing clip, expansion bolts, steel pipes, selection of air door, oil, lead oil, thread, paint and cement shall comply with the quality and specification. 2.2 main machines and tools: 2.2.1 tools: bench drill, electric drill, impact drill, electric pressure test pump, sand wheel, threading machine. 2.2.2 tools: cast iron radiator group on the shelf, the wire keys, pressure case, Guan Qian, iron brush, saw, hammer, spanner, threading plate, homemade wrench, chisel, hacksaw, taps, simmer pipe machine, manual pressure test pump, welding tools, vehicles and other radiator. 2.2.3: measuring the level of scale, ruler, line sinkers, pressure gauge. 2.3 operating conditions: The 2.3.1 group has water and power supply

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档